Close X
Saturday, November 30, 2024
ADVT 
National

Work Starts On Smoother Surfaces For Several Surrey Highways

Darpan News Desk Darpan, 28 Jun, 2016 02:30 PM
    Several stretches of highway in the Surrey area are about to get a new look as work begins on a $5.2 million highway rehabilitation project for highways 10, 15, 91 and 99.
     
    “As part of our commitment through B.C. on the Move, we are making sure we keep provincial highways, bridges and side roads in good condition, which is key to a safe and reliable transportation network,” said Transportation and Infrastructure Minister Todd Stone. “We are headed into another busy construction season with many projects underway in the Lower Mainland as this region continues to see growth in population and the economy.”
     
    The rehabilitation work contract was awarded to Lafarge Canada Inc. The work is scheduled to begin in early July with completion slated for September 2016. In total, 25 kilometres of highway will be resurfaced by milling/filling the existing pavement.
     
     
    Crews will resurface the following stretches of highway: 10 kilometres on the Pacific Highway (Highway 15) in the Samhill area, 10 kilometres on the Ladner-Langley Highway (Highway 10) in the Panorama area, 2 kilometres on the Richmond East/West Connector Highway (Highway 91) in the No. 6 Road area, and 3 kilometres on the Vancouver-Blaine Highway (Highway 99) in the 152nd Street area.
     
    “Surrey is one of the fastest growing communities in the province and it is vital to maintain our current roads and highways,” said Surrey-Cloverdale MLA Stephanie Cadieux. “It is part of our strategy to complement new infrastructure that will eventually improve traffic flow and relieve traffic congestion.”
     
     
    "Highway 91, a major freeway which connects Richmond, Delta and New Westminster, has become busier as the population of Richmond grows. I am glad that rehabilitation work can be done, which increases road safety and helps bring people back home safely," said Richmond East MLA Linda Reid.
     
    B.C. on the Move is government’s new 10-year plan for the improvement of the province’s transportation network. Over the next three years, the Ministry of Transportation and Infrastructure will invest up to $2.7 billion to improve B.C.’s transportation network.
     
    As part of this plan, the B.C. government will invest $380 million over three years to resurface provincial highways. 
     
     
    Highway resurfacing includes conventional paving, hot-in-place recycle paving (an environmentally-friendly, made-in-B.C. technology), and sealcoating for lower volume rural highways. This investment program is the main component of the government’s strategy to resurface 1,000 kilometres of provincial highway annually.

    MORE National ARTICLES

    Is This The Year For CPP Reform? Talks Heat Up As Ministers Prepare For Meeting

    OTTAWA — The stars may finally align for an expansion to the Canada Pension Plan as national talks on its future are expected to intensify over the coming days.

    Is This The Year For CPP Reform? Talks Heat Up As Ministers Prepare For Meeting

    Six Montreal Police Slightly Injured After Violent Incident Near Music Festival

    Six Montreal Police Slightly Injured After Violent Incident Near Music Festival
    MONTREAL — Six Montreal police officers were slightly injured and several buildings damaged after violence broke out near an outdoor music festival.

    Six Montreal Police Slightly Injured After Violent Incident Near Music Festival

    One Winning Ticket For $55 Million Jackpot In Friday's Lotto Max Draw

    TORONTO — There is one winning ticket for the $55 million jackpot in Friday night's Lotto Max draw, and it was purchased somewhere in Ontario.

    One Winning Ticket For $55 Million Jackpot In Friday's Lotto Max Draw

    Smiles, Cheers Greet Verdicts As Pair Found Guilty Of Killing Tim Bosma

    Smiles, Cheers Greet Verdicts As Pair Found Guilty Of Killing Tim Bosma
    Gasps rang out in the Hamilton courtroom as the jury announced the convictions of Dellen Millard, 30, of Toronto, and Mark Smich, 28, of Oakville, both of whom had pleaded not guilty to the murder charges.

    Smiles, Cheers Greet Verdicts As Pair Found Guilty Of Killing Tim Bosma

    Fort McMurray Hospital Back In Business, Welcomes 1st Baby Since Evacuation

    Fort McMurray Hospital Back In Business, Welcomes 1st Baby Since Evacuation
    The first baby has been born at the local hospital since 90,000 people were evacuated from the region due to a wildfire on May 3.

    Fort McMurray Hospital Back In Business, Welcomes 1st Baby Since Evacuation

    Publicist Says Meat Loaf Released From Edmonton Hospital After Collapsing On Stage

    Jeremy Westby with Webster Public Relations said the singer was released Friday morning.

    Publicist Says Meat Loaf Released From Edmonton Hospital After Collapsing On Stage