Close X
Monday, November 18, 2024
ADVT 
National

TransLink unveils first 10 years of Transport 2050 priorities

Darpan News Desk , 20 Apr, 2022 01:47 PM
  • TransLink unveils first 10 years of Transport 2050 priorities

NEW WESTMINSTER, BC – TransLink and the Mayors’ Council on Regional Transportation today released Transport 2050: 10-Year Priorities, detailing priority investments to meet the increasing demand for transit and support the transportation needs of Metro Vancouver’s growing population.

The proposed 10-Year Priorities is the next step to implement the ambitious goals and targets set out in Transport 2050, Metro Vancouver’s recently approved 30-year Regional Transportation Strategy.

Proposed investments detailed in the 10-Year Priorities include:

    • Doubling regional bus service levels
    • Up to 170 kilometres of new rapid transit on up to 11 corridors, including:
      • Up to nine Bus Rapid Transit (BRT) routes using new zero-emission buses on dedicated, traffic-separated lanes
      • A rapid transit connection to the North Shore
      • The Burnaby Mountain Gondola to SFU
      • The Millennium Line SkyTrain extension from Arbutus to UBC
    • Exploring other potential SkyTrain extensions, including Newton in Surrey and Port Coquitlam
    • Building 450 kilometres of new traffic-separated cycling paths

The Transport 2050 Strategy concluded that there is an urgent and widespread need to address climate change, housing affordability, and traffic congestion by increasing and improving transit service as quickly and cost-effectively as possible.

With Transport 2050: 10-Year Priorities, TransLink is proposing an expansion of the SkyTrain network, an unprecedented increase in local bus service, and introducing high-capacity Bus Rapid Transit. This new zero-emissions bus-based rapid transit could be deployed along high-demand corridors throughout Metro Vancouver at a fraction of the cost and time compared to rail-based technology. See the Bus Rapid Transit backgrounder for more details.

In addition to Transport 2050: 10-Year Priorities, TransLink is also releasing the 2022 Investment Plan, which aims to stabilize funding over the next three years.

TransLink is accepting comments from the public on both the 2022 Investment Plan and Transport 2050: 10-Year Priorities starting today. Visit translink.ca/priorities to take the survey until May 4, 2022.

Transport 2050: 10-Year Priorities Facts:

Transport 2050: 10-Year Priorities is a blueprint that identifies our region’s top priorities, so we can get started right away on the first ten years of Transport 2050 investments, which will be funded through future Investment Plans. It is an update to the Mayors’ Council’s 2014 Vision for Metro Vancouver Transit and Transportation.

The proposal includes:

    • The fast deployment of rapid transit: up to nine new traffic-separated Bus Rapid Transit lines
    • More than doubling bus service over 2022 levels, bringing us one-third of the way to the service levels set out in Transport 2050
    • Building the Burnaby Mountain Gondola to Simon Fraser University, joining a growing suite of urban public transit gondolas worldwide
    • Immediately advance the required planning, engagement, and design work to confirm the best alignment, technology, grade separation, terminus locations and phasing for a rapid transit connection between Metrotown and Park Royal via the Second Narrows corridor to be implemented in the latter half of the plan, while delivering better bus service in the short term
    • The Millennium Line SkyTrain extension from Arbutus Street to the University of British Columbia, pending the development of a new funding model with project partners
    • Investing in active transport: completing 75 per cent of the 850-kilometre traffic-separated Major Bikeway Network and building bike networks in every Urban Centre and creating 200 new bike lockers and six new bike parkades
    • A 60 per cent increase to HandyDART service to meet future ridership demand and provide 24-hour service
    • Increasing SeaBus service start and end times to match Expo Line SkyTrain service span

MORE National ARTICLES

Rising COVID-19 cases causing staffing shortages

Rising COVID-19 cases causing staffing shortages
Canada's most populous provinces are facing staff shortages in health- and long-term care as Canada continues to face record-breaking COVID-19 case numbers and hospitalizations related to the highly transmissible Omicron variant.

Rising COVID-19 cases causing staffing shortages

Canada, allies condemn Iran snub on PS752

Canada, allies condemn Iran snub on PS752
The joint condemnation Thursday by Canada, Britain, Sweden and Ukraine comes after Iran ignored a Wednesday deadline by the coalition of countries to negotiate a settlement for the Jan. 8, 2020 disaster that saw Iran's Revolutionary Guard shoot down Ukraine International Airlines Flight 752.

Canada, allies condemn Iran snub on PS752

New tax could reduce housing inequality: report

New tax could reduce housing inequality: report
B.C.'s Housing Ministry says the escalating cost of housing is "concerning" and it will review the report. The B.C. government's housing plan includes cracking down on tax fraud, a vacancy tax and building tens of thousands of new homes, it says.    

New tax could reduce housing inequality: report

Snow slams B.C., rain and freezing rain to come

Snow slams B.C., rain and freezing rain to come
About 15 centimetres of snow blanketed Metro Vancouver overnight and almost double that amount was recorded at Victoria International airport as the latest storm slammed British Columbia's south coast. Airports in Vancouver and Victoria were reporting early delays and telling travellers to check with their airlines and all transit services were suspended in Greater Victoria.

Snow slams B.C., rain and freezing rain to come

Alex Fraser and Patullo bridges could possibly close with more snow in forecast

Alex Fraser and Patullo bridges could possibly close with more snow in forecast
Under normal conditions, the ministry uses a cable-collar system to remove snow that builds up on the cables of the Alex Fraser and Port Mann bridges so traffic can safely pass. However, high winds can increase the shedding of snow and pose a risk to the rope technicians. This prevents them from deploying the system.

Alex Fraser and Patullo bridges could possibly close with more snow in forecast

3,798 COVID19 cases for Wednesday

3,798 COVID19 cases for Wednesday
There are 29,967 active cases of COVID-19 in the province, and 237,195 people who tested positive have recovered. Of the active cases, 317 individuals are in hospital and 83 are in intensive care. The remaining people are recovering at home in self-isolation.

3,798 COVID19 cases for Wednesday