Close X
Monday, November 18, 2024
ADVT 
National

TransLink unveils first 10 years of Transport 2050 priorities

Darpan News Desk , 20 Apr, 2022 01:47 PM
  • TransLink unveils first 10 years of Transport 2050 priorities

NEW WESTMINSTER, BC – TransLink and the Mayors’ Council on Regional Transportation today released Transport 2050: 10-Year Priorities, detailing priority investments to meet the increasing demand for transit and support the transportation needs of Metro Vancouver’s growing population.

The proposed 10-Year Priorities is the next step to implement the ambitious goals and targets set out in Transport 2050, Metro Vancouver’s recently approved 30-year Regional Transportation Strategy.

Proposed investments detailed in the 10-Year Priorities include:

    • Doubling regional bus service levels
    • Up to 170 kilometres of new rapid transit on up to 11 corridors, including:
      • Up to nine Bus Rapid Transit (BRT) routes using new zero-emission buses on dedicated, traffic-separated lanes
      • A rapid transit connection to the North Shore
      • The Burnaby Mountain Gondola to SFU
      • The Millennium Line SkyTrain extension from Arbutus to UBC
    • Exploring other potential SkyTrain extensions, including Newton in Surrey and Port Coquitlam
    • Building 450 kilometres of new traffic-separated cycling paths

The Transport 2050 Strategy concluded that there is an urgent and widespread need to address climate change, housing affordability, and traffic congestion by increasing and improving transit service as quickly and cost-effectively as possible.

With Transport 2050: 10-Year Priorities, TransLink is proposing an expansion of the SkyTrain network, an unprecedented increase in local bus service, and introducing high-capacity Bus Rapid Transit. This new zero-emissions bus-based rapid transit could be deployed along high-demand corridors throughout Metro Vancouver at a fraction of the cost and time compared to rail-based technology. See the Bus Rapid Transit backgrounder for more details.

In addition to Transport 2050: 10-Year Priorities, TransLink is also releasing the 2022 Investment Plan, which aims to stabilize funding over the next three years.

TransLink is accepting comments from the public on both the 2022 Investment Plan and Transport 2050: 10-Year Priorities starting today. Visit translink.ca/priorities to take the survey until May 4, 2022.

Transport 2050: 10-Year Priorities Facts:

Transport 2050: 10-Year Priorities is a blueprint that identifies our region’s top priorities, so we can get started right away on the first ten years of Transport 2050 investments, which will be funded through future Investment Plans. It is an update to the Mayors’ Council’s 2014 Vision for Metro Vancouver Transit and Transportation.

The proposal includes:

    • The fast deployment of rapid transit: up to nine new traffic-separated Bus Rapid Transit lines
    • More than doubling bus service over 2022 levels, bringing us one-third of the way to the service levels set out in Transport 2050
    • Building the Burnaby Mountain Gondola to Simon Fraser University, joining a growing suite of urban public transit gondolas worldwide
    • Immediately advance the required planning, engagement, and design work to confirm the best alignment, technology, grade separation, terminus locations and phasing for a rapid transit connection between Metrotown and Park Royal via the Second Narrows corridor to be implemented in the latter half of the plan, while delivering better bus service in the short term
    • The Millennium Line SkyTrain extension from Arbutus Street to the University of British Columbia, pending the development of a new funding model with project partners
    • Investing in active transport: completing 75 per cent of the 850-kilometre traffic-separated Major Bikeway Network and building bike networks in every Urban Centre and creating 200 new bike lockers and six new bike parkades
    • A 60 per cent increase to HandyDART service to meet future ridership demand and provide 24-hour service
    • Increasing SeaBus service start and end times to match Expo Line SkyTrain service span

MORE National ARTICLES

As storm outages fixed in B.C., new tempest looms

As storm outages fixed in B.C., new tempest looms
BC Hydro says service was restored to the northwestern Vancouver Island villages of Tahsis and Zeballos late Sunday after more than 700 customers lost heat and electricity last Tuesday.     

As storm outages fixed in B.C., new tempest looms

Federal scholarships to honour Flight 752 victims

Federal scholarships to honour Flight 752 victims
The program is expected to disburse scholarships worth an average of $25,000 to 176 students — the same as the number of people who were aboard Ukraine International Airlines Flight 752 when it was hit by two missiles launched by Iran's Revolutionary Guard on Jan. 8, 2020.

Federal scholarships to honour Flight 752 victims

B.C. school opening vital for students: top doctor

B.C. school opening vital for students: top doctor
Getting kids back to school is "essential," says British Columbia's top doctor as she and the education minister laid out plans for keeping students safe while COVID-19 infections surge. Dr. Bonnie Henry said Friday that schools need to remain open for the emotional, physical and intellectual well-being of children.

B.C. school opening vital for students: top doctor

3,144 COVID19 cases on Friday

3,144 COVID19 cases on Friday
There are 33,184 active cases of COVID-19 in the province, and 240,198 people who tested positive have recovered. Of the active cases, 349 individuals are in hospital and 93 are in intensive care. The remaining people are recovering at home in self-isolation.

3,144 COVID19 cases on Friday

Man dies during shooting at a Langley intersection, IHIT takes over investigation

Man dies during shooting at a Langley intersection, IHIT takes over investigation
The area surrounding the scene will be cordoned off for a significant amount of time. The Integrated Homicide Investigation Team (IHIT) has been called and will be working in partnership with Langley RCMP.

Man dies during shooting at a Langley intersection, IHIT takes over investigation

Methane-reduction fund getting overhaul: Wilkinson

Methane-reduction fund getting overhaul: Wilkinson
The third round of applications for the $675-million onshore program of the Emissions Reduction Fund was initially set to close today, but it has been put on hold while Wilkinson's department tries to address some of those concerns.

Methane-reduction fund getting overhaul: Wilkinson