Close X
Thursday, November 14, 2024
ADVT 
National

Team chosen to design eight-lane replacement for B.C.'s Massey tunnel

Darpan News Desk The Canadian Press, 23 Jul, 2024 02:15 PM
  • Team chosen to design eight-lane replacement for B.C.'s Massey tunnel

A team has been selected to design a new eight-lane tunnel to replace the aging George Massey Tunnel under the Fraser River in Metro Vancouver, with British Columbia's transportation minister calling it a "huge step" for the project.

Rob Fleming says the selection of the preferred proponent for the tunnel project, Cross Fraser Partnership, means design plans can now be finalized.

A statement from Fleming's ministry says the proponent will build on extensive design work the province has already completed, working toward a final design and construction agreement that considers the risks and costs of the massive project.

The ministry says the new toll-free tunnel will have three general-purpose lanes and one dedicated lane for public transit in each direction.

It says the new tunnel will also feature a separate multi-use path for people walking, biking or using other modes of transportation to make the crossing.

Dan Coulter, the minister of state for infrastructure and transit, says it will be the first time at that location that people will be able to cross the river by foot or bike.

The province adds that environmental assessment is continuing alongside the development of the project design, with major construction starting in 2026.

The Cross Fraser team includes Bouygues Construction Canada, Fomento de Construcciones y Contratas Canada Ltd., Pomerleau BC and Arcadis Canada.

The project has long been a political friction point, with the former BC Liberal government announcing in 2013 that it would replace the tunnel with a 10-lane bridge.

But the NDP cancelled that proposal shortly after taking office in 2017, prompting a long dispute over how the project should proceed.

MORE National ARTICLES

Vancouver's homeless count to go up

Vancouver's homeless count to go up
A new study by an advocacy group says the homeless population of Vancouver could go up to 4,700 people by 2030. The Carnegie Housing Project made the announcement Tuesday morning at Oppenheimer Park.

Vancouver's homeless count to go up

Heavy snow, winter storm bring hazardous driving conditions to B.C. highways

Heavy snow, winter storm bring hazardous driving conditions to B.C. highways
Environment Canada is warning of hazardous driving conditions on several stretches of British Columbia highways as a strong Pacific frontal system pushes into the Interior. A winter storm warning has been issued for the Sea to Sky Highway from Squamish to Whistler, with snow accumulation forecast to reach up to 50 centimetres by Thursday.  

Heavy snow, winter storm bring hazardous driving conditions to B.C. highways

Son dies in 2021 BC crane tragedy

Son dies in 2021 BC crane tragedy
When Chris Vilness heard about the crane accident that killed a construction worker in Vancouver last week, he was angry, and he didn't have to imagine what the woman's family was going through. In 2021, his son Cailen was among five men killed when a crane that was being dismantled collapsed in Kelowna, B.C.

Son dies in 2021 BC crane tragedy

B.C. Premier Eby apologizes to Doukhobors, for wrongs that 'echoed for generations'

B.C. Premier Eby apologizes to Doukhobors, for wrongs that 'echoed for generations'
British Columbia Premier David Eby has officially apologized in the Victoria legislature to members of the Doukhobor religious community, including children who were forcibly taken from their parents more than 70 years ago. He says those children were physically and psychologically mistreated after being placed in educational facilities, including a former tuberculosis sanatorium in New Denver, in B.C.'s southern Interior.

B.C. Premier Eby apologizes to Doukhobors, for wrongs that 'echoed for generations'

BC not effectively managing hazardous spills

BC not effectively managing hazardous spills
The number of hazardous spills in British Columbia has trended upwards over the last several years, making it even more important for the government to prepare, auditor general Michael Pickup says.  His latest report released Tuesday says the Ministry of Environment is not effectively managing hazardous spills in the province, using a decade-old response plan and data that is not easily accessible.  

BC not effectively managing hazardous spills

Theft involving 14 deer antlers

Theft involving 14 deer antlers
Police in Fort St. John, B.C., are on the lookout after a number of hunting trophies were stolen, including 14 sets of deer antlers. Mounties say the break-in was reported at an abandoned property on Feb. 9 and the rear door had been kicked in.

Theft involving 14 deer antlers