Close X
Sunday, December 1, 2024
ADVT 
National

'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

Darpan News Desk, 13 Dec, 2019 10:27 PM

    Unique to Western Canada, a moveable barrier system with a zipper truck is about to make its debut on the Alex Fraser Bridge to make this key crossing safer and faster for commuters.


    This innovative type of counterflow improves capacity on the bridge and eliminates potential for cross-over collisions during counterflow, as traffic is continually separated by barriers. The system is in the testing phase and expected to be in place for drivers sometime in mid-December 2019.


    “The Alex Fraser Bridge project shows how we are working closely with our partners to build the modern transportation infrastructure needed to keep people safe and support long-term economic growth,” said Catherine McKenna, federal Minister of Infrastructure and Communities. “Together, we are helping communities make positive changes to improve people’s lives, keep our businesses competitive and reduce carbon emissions for our children and grandchildren.”


    Ravi Kahlon, MLA for Delta-North, on behalf of Claire Trevena, B.C.’s Minister of Transportation and Infrastructure, hosted a preview of the zipper truck in action near the weigh scale at Nordel Way on Dec. 12, 2019.


    “I’m thrilled to welcome the zipper system to the Alex Fraser Bridge, which will create an additional lane during peak times and keep drivers protected by barriers,” said Kahlon. “It will make a noticeable and positive difference for about 120,000 people who drive across the Alex Fraser Bridge every day, getting people to work and back home to their families more quickly and reliably.”


    The extra lane will be in place for northbound traffic every weekday from 4:30 a.m. to 11:30 a.m. to help ensure a more efficient and consistent travel time during the morning commute. Outside of these hours, the fourth lane will be open to ease congestion for southbound traffic.


    Upgrades for cyclists and pedestrians include new wayfinding signs, better access via the Cliveden Avenue interchange, widening narrow sections of sidewalk on the bridge and improving the Cliveden and Nordel pathways.


    Previously completed work includes:


    strengthening the bridge to accommodate the additional weight of another lane of traffic (repairing the main span deck, modifying expansion joints and stiffening girders);


    creating a seventh lane to the bridge by removing the shoulders and reconfiguring the pre-existing six lanes from 3.7 metres to 3.55 metres wide;


    adding additional lanes southbound on Highway 91 between Nordel Way and 72nd Avenue; and


    upgrading the Cliveden Avenue and Nordel Way interchanges, including a new signal for traffic accessing the Alex Fraser Bridge northbound from Nordel Way.


    The South of Fraser Advance Traveller Information System portion of the project is ongoing and expected to be finished in spring 2020.

    Thirteen new dynamic message signs are being installed that will predict the estimated travel time on four major Fraser River crossings — Alex Fraser Bridge, Port Mann Bridge, Pattullo Bridge and the George Massey Tunnel. Signs allowing drivers to choose their best route will be located along Highway 17, Highway 1, Highway 10, Marine Way and Knight Street.


    Quick Facts:


    To help keep travellers safe and traffic flowing efficiently as part of the counterflow operations, the speed limit on the Alex Fraser Bridge has been permanently lowered from 90 km/h to 70 km/h.


    The $70-million Alex Fraser Bridge capacity-improvement project is funded by the Government of Canada (more than $32.7 million) and the Province of B.C. (more than $37.3 million).

    MORE National ARTICLES

    Drugs, Cash And Weapons Seized During Proactive Patrols In Burnaby

    Burnaby RCMP’s Community Response Team used their knowledge of the City and instinct to arrest a man suspected of drug dealing in the City.

    Drugs, Cash And Weapons Seized During Proactive Patrols In Burnaby

    The Talk of the Town: Meet Telkwa’s $20-Million Lotto Max Winners- KEN AND SUSAN SALTER

    A break from tradition and a play of the usual numbers was all it took for Telkwa’s Ken and Susan Salter to win the $20-million jackpot from the October 29, 2019 Lotto Max draw.  

    The Talk of the Town: Meet Telkwa’s $20-Million Lotto Max Winners- KEN AND SUSAN SALTER

    More Canadians Plan To Attend Remembrance Day Ceremonies This Year: Poll

    A new survey suggests more Canadians are planning to mark Remembrance Day this year, perhaps in a salute to the few remaining veterans of the Second World War.

    More Canadians Plan To Attend Remembrance Day Ceremonies This Year: Poll

    Vancouver Transit Dispute Ramps Up As Premier John Horgan Warns Against Lengthy Disruption

    British Columbia Premier John Horgan has put union and management in the Metro Vancouver transit dispute on notice that he will not allow disruptions in service to go on much longer.

    Vancouver Transit Dispute Ramps Up As Premier John Horgan Warns Against Lengthy Disruption

    Ontario's Memorial To Veterans Of Afghanistan War Ready For Next Remembrance Day

    A memorial to honour veterans of the war in Afghanistan that is being built on the grounds of the Ontario legislature will include a stone from an Inukshuk that stood at Kandahar Airfield as a tribute to fallen soldiers.

    Ontario's Memorial To Veterans Of Afghanistan War Ready For Next Remembrance Day

    Alberta Alters Rules On Oil Production Limits To Spur More Conventional Drilling

    Alberta Alters Rules On Oil Production Limits To Spur More Conventional Drilling
    Alberta's energy minister says the government is adjusting its rules on oil production limits to give producers incentive to drill more conventional wells.

    Alberta Alters Rules On Oil Production Limits To Spur More Conventional Drilling