Close X
Wednesday, November 27, 2024
ADVT 
National

'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

Darpan News Desk, 13 Dec, 2019 10:27 PM

    Unique to Western Canada, a moveable barrier system with a zipper truck is about to make its debut on the Alex Fraser Bridge to make this key crossing safer and faster for commuters.


    This innovative type of counterflow improves capacity on the bridge and eliminates potential for cross-over collisions during counterflow, as traffic is continually separated by barriers. The system is in the testing phase and expected to be in place for drivers sometime in mid-December 2019.


    “The Alex Fraser Bridge project shows how we are working closely with our partners to build the modern transportation infrastructure needed to keep people safe and support long-term economic growth,” said Catherine McKenna, federal Minister of Infrastructure and Communities. “Together, we are helping communities make positive changes to improve people’s lives, keep our businesses competitive and reduce carbon emissions for our children and grandchildren.”


    Ravi Kahlon, MLA for Delta-North, on behalf of Claire Trevena, B.C.’s Minister of Transportation and Infrastructure, hosted a preview of the zipper truck in action near the weigh scale at Nordel Way on Dec. 12, 2019.


    “I’m thrilled to welcome the zipper system to the Alex Fraser Bridge, which will create an additional lane during peak times and keep drivers protected by barriers,” said Kahlon. “It will make a noticeable and positive difference for about 120,000 people who drive across the Alex Fraser Bridge every day, getting people to work and back home to their families more quickly and reliably.”


    The extra lane will be in place for northbound traffic every weekday from 4:30 a.m. to 11:30 a.m. to help ensure a more efficient and consistent travel time during the morning commute. Outside of these hours, the fourth lane will be open to ease congestion for southbound traffic.


    Upgrades for cyclists and pedestrians include new wayfinding signs, better access via the Cliveden Avenue interchange, widening narrow sections of sidewalk on the bridge and improving the Cliveden and Nordel pathways.


    Previously completed work includes:


    strengthening the bridge to accommodate the additional weight of another lane of traffic (repairing the main span deck, modifying expansion joints and stiffening girders);


    creating a seventh lane to the bridge by removing the shoulders and reconfiguring the pre-existing six lanes from 3.7 metres to 3.55 metres wide;


    adding additional lanes southbound on Highway 91 between Nordel Way and 72nd Avenue; and


    upgrading the Cliveden Avenue and Nordel Way interchanges, including a new signal for traffic accessing the Alex Fraser Bridge northbound from Nordel Way.


    The South of Fraser Advance Traveller Information System portion of the project is ongoing and expected to be finished in spring 2020.

    Thirteen new dynamic message signs are being installed that will predict the estimated travel time on four major Fraser River crossings — Alex Fraser Bridge, Port Mann Bridge, Pattullo Bridge and the George Massey Tunnel. Signs allowing drivers to choose their best route will be located along Highway 17, Highway 1, Highway 10, Marine Way and Knight Street.


    Quick Facts:


    To help keep travellers safe and traffic flowing efficiently as part of the counterflow operations, the speed limit on the Alex Fraser Bridge has been permanently lowered from 90 km/h to 70 km/h.


    The $70-million Alex Fraser Bridge capacity-improvement project is funded by the Government of Canada (more than $32.7 million) and the Province of B.C. (more than $37.3 million).

    MORE National ARTICLES

    Accessibility Consultation Hears From Thousands Of British Columbians

    Accessibility Consultation Hears From Thousands Of British Columbians
    More than 6,300 people have shared their experiences and feedback on proposed accessibility legislation for B.C.

    Accessibility Consultation Hears From Thousands Of British Columbians

    Christmas Tree Cutting Permits Available

    Christmas Tree Cutting Permits Available
    British Columbians who want to cut their own Christmas tree can get a permit online, or by contacting their local natural resource district office or FrontCounter BC office.

    Christmas Tree Cutting Permits Available

    City Of Vancouver Says It's Ready For Ride-Hailing

    The City of Vancouver is ready to license ride-hailing companies so they can get on the road and serve residents, businesses, and visitors.   

    City Of Vancouver Says It's Ready For Ride-Hailing

    Surrey Roads Take A Technology Leap With New Advanced Traveller Information System

    The City of Surrey announced today the launch of its Advanced Traveller Information System (ATIS), which will help motorists make more informed decisions to improve their commute, reduce the environmental impact of driving, and lessen driver frustration.    

    Surrey Roads Take A Technology Leap With New Advanced Traveller Information System

    Surrey Mayor Doug McCallum And Head of Surrey RCMP Clashing Over The City’s New Budget - WATCH

    City council has passed a budget that places a freeze on the hiring of new RCMP officers and firefighters to help pay for the transition to a new municipal police service.

    Surrey Mayor Doug McCallum And Head of Surrey RCMP Clashing Over The City’s New Budget - WATCH

    NICHOLAS KHABRA MURDER: ‘Extremely Violent’ B.C. Fugitive Brandon Teixeira Arrested In Oroville, California By US Agencies

    THE Integrated Homicide Investigation Team are telling that Brandon Natahan Teixeira, 28, wanted for the October 2017 murder of Nicholas Khabra in Surrey, was arrested by SWAT in a small California community, Oroville, on Sunday

    NICHOLAS KHABRA MURDER: ‘Extremely Violent’ B.C. Fugitive Brandon Teixeira Arrested In Oroville, California By US Agencies