Close X
Friday, November 15, 2024
ADVT 
National

Nexen Halts Production At Oilsands Plant Following Fatal Explosion

Darpan News Desk The Canadian Press, 16 Jan, 2016 01:38 PM
    CALGARY — A senior executive with Nexen Energy ULC says the company's upgrader near Fort McMurray remains shut down while investigators examine the cause of an explosion that killed one worker and critically injured another.
     
    Ron Bailey, the company's senior vice-president of Canadian operations, told a news conference in Calgary on Saturday that it's too soon after the blast to speculate how long the shutdown at Long Lake will last.
     
    Bailey says the facilities are being kept warm to prevent damage from the cold, which dipped to -29 C in Fort McMurray on Saturday afternoon.
     
    The explosion happened Friday in a building that's part of the upgrader's hydrocracker, which Bailey says breaks hydrocarbon molecules into smaller pieces to make a lighter oil product for shipping.
     
    Nexen Energy said in a statement Friday night that there is no immediate danger to the neighbouring community or to personnel still on site at the plant.
     
    Bailey says the worker who was injured has been transported to a burn unit in Edmonton.
     
    "Our employees, contractors and neighbouring communities are our primary concern at this time and we can confirm that we have taken steps to ensure their well-being and safety and we continue to provide them with timely information," Bailey said.
     
    "We notified the regulatory bodies immediately and we're fully co-operating and working through the investigation of the incident, and we've already begun our internal investigation to really understand the cause of this."
     
    Both Alberta's Occupational Health and Safety department and the Alberta Energy Regulator have dispatched staff to the site.
     
    Calgary-based Nexen Energy ULC was acquired by China's state-owned CNOOC Ltd. more than two years ago.
     
    Nexen CEO Fang Zhi told the news conference that the incident marked "one of the toughest days in Nexen's history."
     
    "Our motto at CNOOC is that there is nothing so important that it cannot be done safely. Yesterday, we did not live up to that standard and I deeply regret it," he said.
     
    Bailey said the worker who died and the worker who was injured were the only two people who were hurt. He said they were conducting maintenance at the time of the explosion.
     
    Anywhere from 100 to 500 employees can be at the site, Bailey said, depending on what sort of maintenance is being done.
     
    A pipeline rupture at the plant last summer leaked five million litres of a mixture of bitumen, produced water and sand into muskeg. The company shut the plant down while it complied with a pipeline suspension order from the AER, which had determined Nexen was not complying with pipeline maintenance and monitoring regulations.
     
    The suspension order was lifted in September and the plant returned to full operations.
     
    Bailey said the explosion happened in a part of the plant that was not involved in the leak.

    MORE National ARTICLES

    Debate Picking Up Over Whether To Put Away Statues Of Canada Historical Figures

    Debate Picking Up Over Whether To Put Away Statues Of Canada Historical Figures
    HALIFAX — The debate over whether to knock statues of controversial figures off their pedestals has erupted again in Canada, as history writers and academics in two cities differ over how the present should influence the honouring of the past. 

    Debate Picking Up Over Whether To Put Away Statues Of Canada Historical Figures

    Saskatoon Hotel Cancels Trade Show That Was To Promote Africa Trophy Hunts

    Saskatoon Hotel Cancels Trade Show That Was To Promote Africa Trophy Hunts
    SASKATOON — A trade show that was to showcase companies that offer trophy hunts in Africa is no longer going to be held at a Saskatoon hotel.

    Saskatoon Hotel Cancels Trade Show That Was To Promote Africa Trophy Hunts

    Alberta Crown Says Forensics, Phone Records Tie Vader To Mccann Killings

    Alberta Crown Says Forensics, Phone Records Tie Vader To Mccann Killings
    EDMONTON — Court documents show forensic evidence, cellphone records, an undercover sting and a bullet hole in a hat are part of the Crown's long-running attempt to tie a suspect to the mysterious disappearance of two Alberta seniors.

    Alberta Crown Says Forensics, Phone Records Tie Vader To Mccann Killings

    B.C.'s Largest 10-Lane Toll Bridge Worth $3.5 Billion To Replace Massey Tunnel

    B.C.'s Largest 10-Lane Toll Bridge Worth $3.5 Billion To Replace Massey Tunnel
    The B.C. government says the replacement for the George Massey Tunnel will be the largest bridge in provincial history with a cost of $3.5 billion.

    B.C.'s Largest 10-Lane Toll Bridge Worth $3.5 Billion To Replace Massey Tunnel

    Ontario Mother Charged With First-Degree Murder In Death Of Her 2-Year-Old Son

    Ontario Mother Charged With First-Degree Murder In Death Of Her 2-Year-Old Son
    An Ontario woman was charged with first-degree murder Tuesday after her two-year-old son was found dead with "obvious signs of physical trauma."

    Ontario Mother Charged With First-Degree Murder In Death Of Her 2-Year-Old Son

    Metro Vancouver Board Recommends Mayors' Council Take Control Of TransLink

    Board chairman Greg Moore says the change would strengthen ties between the region's transportation system and land-use planning.

    Metro Vancouver Board Recommends Mayors' Council Take Control Of TransLink