Close X
Saturday, September 21, 2024
ADVT 
National

Nexen Halts Production At Oilsands Plant Following Fatal Explosion

Darpan News Desk The Canadian Press, 16 Jan, 2016 01:38 PM
    CALGARY — A senior executive with Nexen Energy ULC says the company's upgrader near Fort McMurray remains shut down while investigators examine the cause of an explosion that killed one worker and critically injured another.
     
    Ron Bailey, the company's senior vice-president of Canadian operations, told a news conference in Calgary on Saturday that it's too soon after the blast to speculate how long the shutdown at Long Lake will last.
     
    Bailey says the facilities are being kept warm to prevent damage from the cold, which dipped to -29 C in Fort McMurray on Saturday afternoon.
     
    The explosion happened Friday in a building that's part of the upgrader's hydrocracker, which Bailey says breaks hydrocarbon molecules into smaller pieces to make a lighter oil product for shipping.
     
    Nexen Energy said in a statement Friday night that there is no immediate danger to the neighbouring community or to personnel still on site at the plant.
     
    Bailey says the worker who was injured has been transported to a burn unit in Edmonton.
     
    "Our employees, contractors and neighbouring communities are our primary concern at this time and we can confirm that we have taken steps to ensure their well-being and safety and we continue to provide them with timely information," Bailey said.
     
    "We notified the regulatory bodies immediately and we're fully co-operating and working through the investigation of the incident, and we've already begun our internal investigation to really understand the cause of this."
     
    Both Alberta's Occupational Health and Safety department and the Alberta Energy Regulator have dispatched staff to the site.
     
    Calgary-based Nexen Energy ULC was acquired by China's state-owned CNOOC Ltd. more than two years ago.
     
    Nexen CEO Fang Zhi told the news conference that the incident marked "one of the toughest days in Nexen's history."
     
    "Our motto at CNOOC is that there is nothing so important that it cannot be done safely. Yesterday, we did not live up to that standard and I deeply regret it," he said.
     
    Bailey said the worker who died and the worker who was injured were the only two people who were hurt. He said they were conducting maintenance at the time of the explosion.
     
    Anywhere from 100 to 500 employees can be at the site, Bailey said, depending on what sort of maintenance is being done.
     
    A pipeline rupture at the plant last summer leaked five million litres of a mixture of bitumen, produced water and sand into muskeg. The company shut the plant down while it complied with a pipeline suspension order from the AER, which had determined Nexen was not complying with pipeline maintenance and monitoring regulations.
     
    The suspension order was lifted in September and the plant returned to full operations.
     
    Bailey said the explosion happened in a part of the plant that was not involved in the leak.

    MORE National ARTICLES

    Former Crown Prosecutor To Probe Police Handling Of Richard Oland Murder

    Former Crown Prosecutor To Probe Police Handling Of Richard Oland Murder
    The review was announced days after a jury found Dennis Oland guilty in the death of his father, whose body was found in his Saint John office in July 2011.

    Former Crown Prosecutor To Probe Police Handling Of Richard Oland Murder

    Bulk Carrier From Marshall Islands Is The First Ship To Reach Montreal In 2016

    Bulk Carrier From Marshall Islands Is The First Ship To Reach Montreal In 2016
    The Vigorous left from Sohar, Oman, on Nov. 30 and crossed the Montreal port's downstream limits at 5:21 Friday morning.

    Bulk Carrier From Marshall Islands Is The First Ship To Reach Montreal In 2016

    How Response To Syrian Refugee Crisis Went From 10k In Three Years To Months

    How Response To Syrian Refugee Crisis Went From 10k In Three Years To Months
    When the Conservative government promised, in January 2015, to resettle 10,000 Syrian refugees over three years, Liberal MP John McCallum didn't buy it.

    How Response To Syrian Refugee Crisis Went From 10k In Three Years To Months

    Woman Critically Injured Defending Toddler In Second B.C. Dog Attack Within Week

    Woman Critically Injured Defending Toddler In Second B.C. Dog Attack Within Week
    Officers in Richmond, B.C., responded Wednesday afternoon to multiple reports of a 21-year-old woman covered in blood, fending off a large Rottweiler cross on an outdoor field. Police had previously identified the animal as a Rottweiler-pit bull cross.

    Woman Critically Injured Defending Toddler In Second B.C. Dog Attack Within Week

    Canadians Go For Frosty New Year's Day Swim In Annual Polar Bear Plunges

    Canadians Go For Frosty New Year's Day Swim In Annual Polar Bear Plunges
    Canadians across the country are participating in a frosty New Year's Day tradition — the polar bear dip.

    Canadians Go For Frosty New Year's Day Swim In Annual Polar Bear Plunges

    Dog Attack: Richmond Woman Critically Injured By Dog While Defending 3-Year-Old Nephew

    Dog Attack: Richmond Woman Critically Injured By Dog While Defending 3-Year-Old Nephew
    RCMP say the boy's aunt is undergoing surgery after suffering more than 100 bites to her body, a broken arm and a detached bicep.

    Dog Attack: Richmond Woman Critically Injured By Dog While Defending 3-Year-Old Nephew