Close X
Sunday, November 10, 2024
ADVT 
National

Nexen Halts Production At Oilsands Plant Following Fatal Explosion

Darpan News Desk The Canadian Press, 16 Jan, 2016 01:38 PM
    CALGARY — A senior executive with Nexen Energy ULC says the company's upgrader near Fort McMurray remains shut down while investigators examine the cause of an explosion that killed one worker and critically injured another.
     
    Ron Bailey, the company's senior vice-president of Canadian operations, told a news conference in Calgary on Saturday that it's too soon after the blast to speculate how long the shutdown at Long Lake will last.
     
    Bailey says the facilities are being kept warm to prevent damage from the cold, which dipped to -29 C in Fort McMurray on Saturday afternoon.
     
    The explosion happened Friday in a building that's part of the upgrader's hydrocracker, which Bailey says breaks hydrocarbon molecules into smaller pieces to make a lighter oil product for shipping.
     
    Nexen Energy said in a statement Friday night that there is no immediate danger to the neighbouring community or to personnel still on site at the plant.
     
    Bailey says the worker who was injured has been transported to a burn unit in Edmonton.
     
    "Our employees, contractors and neighbouring communities are our primary concern at this time and we can confirm that we have taken steps to ensure their well-being and safety and we continue to provide them with timely information," Bailey said.
     
    "We notified the regulatory bodies immediately and we're fully co-operating and working through the investigation of the incident, and we've already begun our internal investigation to really understand the cause of this."
     
    Both Alberta's Occupational Health and Safety department and the Alberta Energy Regulator have dispatched staff to the site.
     
    Calgary-based Nexen Energy ULC was acquired by China's state-owned CNOOC Ltd. more than two years ago.
     
    Nexen CEO Fang Zhi told the news conference that the incident marked "one of the toughest days in Nexen's history."
     
    "Our motto at CNOOC is that there is nothing so important that it cannot be done safely. Yesterday, we did not live up to that standard and I deeply regret it," he said.
     
    Bailey said the worker who died and the worker who was injured were the only two people who were hurt. He said they were conducting maintenance at the time of the explosion.
     
    Anywhere from 100 to 500 employees can be at the site, Bailey said, depending on what sort of maintenance is being done.
     
    A pipeline rupture at the plant last summer leaked five million litres of a mixture of bitumen, produced water and sand into muskeg. The company shut the plant down while it complied with a pipeline suspension order from the AER, which had determined Nexen was not complying with pipeline maintenance and monitoring regulations.
     
    The suspension order was lifted in September and the plant returned to full operations.
     
    Bailey said the explosion happened in a part of the plant that was not involved in the leak.

    MORE National ARTICLES

    Canadian Man Sentenced To 11 Years In Prison For Defrauding The U.s. Of $3.5 Million

    Canadian Man Sentenced To 11 Years In Prison For Defrauding The U.s. Of $3.5  Million
    In addition to 135 months in prison, Kevin Cyster also must pay the money back.

    Canadian Man Sentenced To 11 Years In Prison For Defrauding The U.s. Of $3.5 Million

    Shell-Led Joint Venture Obtains Key Permit For LNG Facility In Kitimat, B.C.

    Shell-Led Joint Venture Obtains Key Permit For LNG Facility In Kitimat, B.C.
      LNG Canada says it is the first in the province to receive the permit from the B.C. Oil and Gas Commission.

    Shell-Led Joint Venture Obtains Key Permit For LNG Facility In Kitimat, B.C.

    Victoria School District Worries New Homeless Shelter Puts Students At Risk

    Victoria School District Worries New Homeless Shelter Puts Students At Risk
    Piet Langstraat said the province and the City of Victoria must pay the estimated $44,000 for extra custodial staff and crossing guards needed to ensure everyone's safety at Central Middle School.

    Victoria School District Worries New Homeless Shelter Puts Students At Risk

    Classified Ad Seeking To Connect BC Woman With Father Who Doesn't Know She Exists

    Classified Ad Seeking To Connect BC Woman With Father Who Doesn't Know She Exists
    Toni Rempel is looking for a man named Gary who was in Regina on business in 1969.

    Classified Ad Seeking To Connect BC Woman With Father Who Doesn't Know She Exists

    Victoria's Courthouse Campers On Move To Shelter After Months Outside

    Victoria's Courthouse Campers On Move To Shelter After Months Outside
    Wet, cold and windy nights adjusting tarps and pounding pegs into the soggy ground are about to come to an end for John Bertrim and dozens of others who have slept in tents on the Victoria Law Courts' lawn for months.

    Victoria's Courthouse Campers On Move To Shelter After Months Outside

    Trial Date Expected To Be Set For Man Charged With Shooting B.C. Mountie

    Trial Date Expected To Be Set For Man Charged With Shooting B.C. Mountie
    Courtroom scheduling matters have delayed the case of 37-year-old Kenneth Knutson, who is set to return to court on Jan. 18.

    Trial Date Expected To Be Set For Man Charged With Shooting B.C. Mountie