Close X
Thursday, November 28, 2024
ADVT 
National

New Brunswick Looks To Hydrogen From Seawater As Fuel For Future Power

Darpan News Desk The Canadian Press, 26 Feb, 2019 08:55 PM

    FREDERICTON — New Brunswick's Crown-owned power utility is partnering with a Florida-based company to develop power plants that would use hydrogen extracted from seawater as their fuel.


    NB Power signed a license agreement with Joi Scientific three years ago, but have now agreed to work together to test the technology and build a number of prototypes.


    "We're working together to create the world's first emission-free utility," said Traver Kennedy, CEO of Joi Scientific.


    "What we're announcing now is we're working in a co-development arrangement where they've now taken some space at the Kennedy Space Centre to work shoulder to shoulder with us to build prototypes that we will eventually be bringing to Canada," Kennedy said.


    He said his company has developed a new way to extract hydrogen from unprocessed seawater and, when used as a fuel to generate power, the only emissions are water vapour.


    Kennedy said power generation could be done in a variety of ways ranging from fuel cells to traditional power plants.


    "In what we're doing with NB Power we're looking at deployments that could range from 10 megawatts to 100 megawatts. In that case we'd use hydrogen-based internal combustion engines," Kennedy said.


    NB Power President Gaetan Thomas said it could be two or three years before they would have small prototypes ready, and the cost would be about the same as a natural gas-fired plant.


    He said aside from new power plants, they could consider conversion of existing facilities.


    "We're looking at both. We have contemplated distributed generation which would mean new smaller facilities, but we are also looking at provisions to actually do it larger scale and whether it could do the whole Belledune or part of Belledune with a mixture of fuels in Belledune," he said.


    Belledune is currently a 450-megawatt, coal-fired plant on New Brunswick's north shore.


    The costs of the "Hydrogen 2.0" technology and the license agreement are being kept confidential.


    Kennedy would also not discuss details concerning the amount of power required to extract the hydrogen versus the amount of power that could be generated using the hydrogen as a fuel. He said the company is still in the process of filing patents and wouldn't reveal those details publicly right now.


    Thomas said the utility is looking at all its options, but it might make more sense to have numerous small facilities around the province rather that a large generator, in order to avoid transmission loss.

    MORE National ARTICLES

    New Gun-Control Recommendations Due 'In The Coming Weeks,' Minister Says

    New Gun-Control Recommendations Due 'In The Coming Weeks,' Minister Says
    OTTAWA — Federal minister Bill Blair says his ideas for new gun-control rules might come within weeks.    

    New Gun-Control Recommendations Due 'In The Coming Weeks,' Minister Says

    Quebec Education Department Admits To Surveying Schools On Religious Symbols

    Quebec Education Department Admits To Surveying Schools On Religious Symbols
    MONTREAL — Quebec's Education Department is admitting it began surveying schools months ago about how many employees wear religious symbols on the job.

    Quebec Education Department Admits To Surveying Schools On Religious Symbols

    Khadr Trying New Way To Get Out From Under 'Indefinite' Sentence And Bail

    In a separate application before Federal Court, Khadr is attempting to force national parole authorities to grant him a hearing at which he would argue for release.

    Khadr Trying New Way To Get Out From Under 'Indefinite' Sentence And Bail

    Controversial Gatineau City Councillor Questions Whether The Earth Is Round

    Controversial Gatineau City Councillor Questions Whether The Earth Is Round
    Nathalie Lemieux of Gatineau, Que. created a controversy last week after she told a reporter the word "Islamophobia'' doesn't exist for her.

    Controversial Gatineau City Councillor Questions Whether The Earth Is Round

    B.C. Aims To Reduce Wait Times For Parkinson'S Patients Needing Brain Surgery

    B.C. Aims To Reduce Wait Times For Parkinson'S Patients Needing Brain Surgery
    The Health Ministry says 72 surgeries will be performed in the current fiscal year, up from 36 operations, as part of a program starting in April.

    B.C. Aims To Reduce Wait Times For Parkinson'S Patients Needing Brain Surgery

    Bring Transparency Reforms To B.C. Legislature, Say Independent Officers

    Bring Transparency Reforms To B.C. Legislature, Say Independent Officers
    A report alleging "flagrant" overspending by two top officials at British Columbia's legislature has prompted a call for major accountability and transparency reforms.

    Bring Transparency Reforms To B.C. Legislature, Say Independent Officers