Close X
Saturday, November 23, 2024
ADVT 
National

New Brunswick Looks To Hydrogen From Seawater As Fuel For Future Power

Darpan News Desk The Canadian Press, 26 Feb, 2019 08:55 PM

    FREDERICTON — New Brunswick's Crown-owned power utility is partnering with a Florida-based company to develop power plants that would use hydrogen extracted from seawater as their fuel.


    NB Power signed a license agreement with Joi Scientific three years ago, but have now agreed to work together to test the technology and build a number of prototypes.


    "We're working together to create the world's first emission-free utility," said Traver Kennedy, CEO of Joi Scientific.


    "What we're announcing now is we're working in a co-development arrangement where they've now taken some space at the Kennedy Space Centre to work shoulder to shoulder with us to build prototypes that we will eventually be bringing to Canada," Kennedy said.


    He said his company has developed a new way to extract hydrogen from unprocessed seawater and, when used as a fuel to generate power, the only emissions are water vapour.


    Kennedy said power generation could be done in a variety of ways ranging from fuel cells to traditional power plants.


    "In what we're doing with NB Power we're looking at deployments that could range from 10 megawatts to 100 megawatts. In that case we'd use hydrogen-based internal combustion engines," Kennedy said.


    NB Power President Gaetan Thomas said it could be two or three years before they would have small prototypes ready, and the cost would be about the same as a natural gas-fired plant.


    He said aside from new power plants, they could consider conversion of existing facilities.


    "We're looking at both. We have contemplated distributed generation which would mean new smaller facilities, but we are also looking at provisions to actually do it larger scale and whether it could do the whole Belledune or part of Belledune with a mixture of fuels in Belledune," he said.


    Belledune is currently a 450-megawatt, coal-fired plant on New Brunswick's north shore.


    The costs of the "Hydrogen 2.0" technology and the license agreement are being kept confidential.


    Kennedy would also not discuss details concerning the amount of power required to extract the hydrogen versus the amount of power that could be generated using the hydrogen as a fuel. He said the company is still in the process of filing patents and wouldn't reveal those details publicly right now.


    Thomas said the utility is looking at all its options, but it might make more sense to have numerous small facilities around the province rather that a large generator, in order to avoid transmission loss.

    MORE National ARTICLES

    Six Arrested In Maple Ridge, B.C., During Fire Safety Enforcement At Tent Camp

    Six Arrested In Maple Ridge, B.C., During Fire Safety Enforcement At Tent Camp
    MAPLE RIDGE, B.C. — Six people have been arrested in Maple Ridge, B.C., as officials in that Metro Vancouver suburb enforce an injunction covering fire safety issues at a homeless camp.

    Six Arrested In Maple Ridge, B.C., During Fire Safety Enforcement At Tent Camp

    Relatives Arriving In N.S. To Support Mother And Father Of Seven Fire Victims

    HALIFAX — Several family members of the mother of seven children who died in a fast-moving house fire are arriving in Halifax today to bring support to their grieving relative.

    Relatives Arriving In N.S. To Support Mother And Father Of Seven Fire Victims

    Jody Wilson-Raybould Can Speak About SNC-Lavalin Affair At Committee: Trudeau

    OTTAWA — Prime Minister Justin Trudeau says former attorney general Jody Wilson-Raybould will be permitted to speak publicly about some of the details of the SNC-Lavalin affair.    

    Jody Wilson-Raybould Can Speak About SNC-Lavalin Affair At Committee: Trudeau

    First-Of-Its-Kind Registry In B.C. Targets Under-The-Radar Condo Flippers

     The British Columbia government says it has launched Canada's first registry aimed at cracking down on pre-sale property flipping and tax evasion in B.C.'s real estate market.

    First-Of-Its-Kind Registry In B.C. Targets Under-The-Radar Condo Flippers

    B.C. Mines Minister Says Mount Polley Disaster Behind Safety Upgrades

    B.C. Mines Minister Says Mount Polley Disaster Behind Safety Upgrades
    British Columbia's mines minister says the Mount Polley tailings pond collapse is behind changes to increase safety and regulation enforcement in provincial mining operations.

    B.C. Mines Minister Says Mount Polley Disaster Behind Safety Upgrades

    Prime Minister Trudeau Expresses Love For Canadiens On Trade Deadline Day

    Prime Minister Justin Trudeau wasn't about to shy away from supporting his favourite Canadian hockey team on trade deadline day.

    Prime Minister Trudeau Expresses Love For Canadiens On Trade Deadline Day