Close X
Sunday, November 24, 2024
ADVT 
National

New 8 lane tunnel to replace George Massey Tunnel by 2030

Darpan News Desk The Canadian Press, 18 Aug, 2021 02:09 PM
  • New 8 lane tunnel to replace George Massey Tunnel by 2030

An eight-lane tunnel under the Fraser River will replace an obsolete crossing that has frustrated Metro Vancouver drivers for decades.

The B.C. government announced the new tunnel connecting the cities of Delta and Richmond on Highway 99 will cost $4.15 billion, with an estimated completion date of 2030.

Construction of the replacement for the George Massey Tunnel is set to start in 2025,Transportation Minister Rob Fleming told a news conference Wednesday.

The new tunnel will improve traffic flow, save travel time and make travel easier for those taking transit, cycling or walking, he said, adding it will not be tolled.

Two of the eight lanes, one in each direction, will be dedicated to rapid bus transit and there will be separated pathways for cyclists and pedestrians.

"We're developing a tunnel that will not only significantly improve travel along (the) Highway 99 corridor but will also give people real options to leave their cars at home in favour of efficient public transit or active transportation," Fleming said.

Asked whether the planned tunnel will really reduce travel time for commuters during rush hour given two lanes will be reserved for buses, Fleming said the current four-lane tunnel uses a counter-flow system that leads to congestion.

"When it's in a counter-flow peak period, it goes down to one lane in one direction, so you get congestion throughout the (tunnel)" wherever you're heading, he said.

The tunnel option was chosen instead of an eight-lane bridge because it was endorsed by the regional district, causes the least harm to the surrounding area, including the river, and allows for work to start right away, the province said.

Former premier Christy Clark promised a 10-lane bridge during the 2013 election, but the work was put on hold when the NDP took power in 2017.

The bridge project had a completion date set for 2022 and in defence of the delay, Fleming pointed to "strenuous objections" to that plan from local governments.

An environmental assessment certificate had been issued for the previously planned bridge and Fleming said the province will move ahead immediately with improvements to the surrounding infrastructure while it works through the procurement and environmental assessment processes for the new tunnel.

"We're going to have a robust environmental assessment on this project, we're going to continue to work with Indigenous rights holders," he said.

The province is hoping to receive "significant federal contribution" to help cover the cost of the project, Fleming said.

"The discussions we've had with the federal government have been very productive in this regard," he said, adding that to his knowledge, the major parties campaigning in the federal election set for Sept. 20 are also supportive of the project.

"We've made the case that this is a nationally significant trade corridor."

Asked how long the new crossing is expected to keep up with population growth and development in the region, Fleming said congestion modelling and growth projections will be part of a business case that should soon be publicly available.

MORE National ARTICLES

RBC presents the 11th Annual DARPAN Extraordinary Achievement Awards

RBC presents the 11th Annual DARPAN Extraordinary Achievement Awards
“We are excited that RBC is joining us this year in celebrating the achievements of the South Asian community, and helping us put the event together,” say DARPAN Magazine’s publisher Ramneek Dhillon.  

RBC presents the 11th Annual DARPAN Extraordinary Achievement Awards

More Canadians say worst of COVID-19 yet to come

More Canadians say worst of COVID-19 yet to come
Fifty-four per cent of respondents to an online survey by Leger and the Association for Canadian Studies say the worst of the COVID-19 crisis is already over, compared with 63 per cent who believed so in a survey last month.

More Canadians say worst of COVID-19 yet to come

Results of pandemic election won't be immediate

Results of pandemic election won't be immediate
They're part of a process Elections Canada has devised to ensure an election can be conducted safely and produce trustworthy results while the country remains in the grip of COVID-19.

Results of pandemic election won't be immediate

Long-term care improvements could top $13B

Long-term care improvements could top $13B
A report published this morning by parliamentary budget officer Yves Giroux estimates ending wait lists, increasing staff pay and benefits, providing more hours of care each day and expanding home care could cost around $13.7 billion.

Long-term care improvements could top $13B

Canada, U.S. can't share firefighters

Canada, U.S. can't share firefighters
Last year, Canada sent 529 front-line crew members, 62 supervisory teams and a number of aircraft to help the U.S. battle rampant wildfires in California and the Pacific Northwest.

Canada, U.S. can't share firefighters

Vancouver home sales down 11.6% from June: REBGV

Vancouver home sales down 11.6% from June: REBGV
The B.C. board says home sales in the region totalled 3,326 last month, a 6.3 per cent increase from the 3,128 sales recorded last July and an 11.6 per cent drop from the 3,762 homes sold in June.

Vancouver home sales down 11.6% from June: REBGV