Close X
Monday, December 2, 2024
ADVT 
National

Nearly 390 Kilometres Of Highway Improvements In Northern B.C.

Darpan News Desk , 22 Jul, 2019 08:19 PM

    Crews are starting work on a highway resurfacing project on Highway 37 between Stewart and Dease Lake, making the drive safer and smoother for travellers.


    This is one of nine major highway projects in northern B.C. that cover nearly 390 kilometres of highways and side roads.


    “We are hard at work in northern B.C. this summer, paving roadways and building essential infrastructure,” said Claire Trevena, Minister of Transportation and Infrastructure. “These important projects will make a big difference to local people and those travelling through the region.”


    This $7.9-million project includes approximately 27 kilometres of resurfacing along Highway 37, starting about 60 kilometres north of the Meziadin Junction and continuing north to Burrage Air Strip.


    The contractor, Pittman Asphalt of Prince George, will work to minimize traffic disruptions for people who live and work in this area.


    There are eight other major resurfacing projects taking place in northern B.C. this summer:


    Highway 97 (near Fort St. John): hot-in-place recycling for 45 kilometres of Highway 97, 10 kilometres of Beatton Airport Road and seven kilometres of 271 Road.


    Highway 97 (near Taylor): overlay asphalt resurfacing for 6.5 kilometres of Highway 97 from North Taylor Hill to the intersection of Swanson Road and Lumber Road, as well as a total of seven kilometres on various Peace District side roads.


    Highway 97 (near Dawson Creek): hot-in-place resurfacing for 52.8 kilometres of Highway 97 from East Pine Road to Road 247.


    Highway 52 (near Tumbler Ridge): sealcoating for 58.9 kilometres of Highway 52, from Junction 29 to Rat Lake Road.


    Highways 16 and 97 (near Prince George): mill and fill asphalt resurfacing for 34.2 kilometres of Highway 16 from Hooper Road to Jutland Road and Highway 97 from 5th Avenue to North Kelly Road.


    Highway 16 (near Burns Lake): mill and fill asphalt resurfacing for 36.4 kilometres of Highway 16 from Endako to Fort Fraser and Burns Lake Arterial.


    Highway 16 (near Telkwa): sealcoating for 34.7 kilometres of Highway 16 from Tower Road to Wakefield Road and on Babine Lake Road.


    Highway 16 (near Hazelton): sealcoating for 68.5 kilometres of Highway 16 from Boulder Creek West to New Hazelton and along the Kispiox Valley Road.
    Highway resurfacing improves the safety and efficiency of the roadway, provides safer driving conditions for the travelling public and improves the movement of goods and services.


    In total, there are 20 major highway and related infrastructure projects underway in northern B.C., representing an investment of nearly $154 million.

    MORE National ARTICLES

    Mounties Put More Eyes In The Sky With Expanding Drone Fleet

    OTTAWA — Newly disclosed records show the RCMP has assembled a fleet of more than 200 flying drones — eyes in the sky that officers use for everything from accident-scene investigation to protecting VIP visitors.

    Mounties Put More Eyes In The Sky With Expanding Drone Fleet

    'Wasn't On The Radar:' Parents Accused In Son's Death Unaware He Had Meningitis

    LETHBRIDGE, Alta. — The father of a toddler who died of bacterial meningitis says he and his wife didn't realize their son had contracted the potentially deadly disease.

    'Wasn't On The Radar:' Parents Accused In Son's Death Unaware He Had Meningitis

    Second Banff Grizzly Dies After Being Struck By Vehicle: Parks Canada

    Second Banff Grizzly Dies After Being Struck By Vehicle: Parks Canada
    BANFF, Alta. — Motorists in Banff National Park are being urged to heed speed limits and report wildlife sightings after the second grizzly bear in three weeks died from a vehicle strike.

    Second Banff Grizzly Dies After Being Struck By Vehicle: Parks Canada

    Alberta Government, Opposition Swap Accusations, Attacks In Earplug Debate

    Alberta Government, Opposition Swap Accusations, Attacks In Earplug Debate
    Alberta's earplug debate got louder Monday as the Opposition NDP accused Premier Jason Kenney of lying and sought to have Government House Leader Jason Nixon found in contempt of the legislature.

    Alberta Government, Opposition Swap Accusations, Attacks In Earplug Debate

    Mysterious Group Behind Mass Text Message Seeking Views On Carbon Tax

    Mysterious Group Behind Mass Text Message Seeking Views On Carbon Tax
    Many Ontarians received an automated text message over the weekend, asking if they agree that the carbon tax must be scrapped.

    Mysterious Group Behind Mass Text Message Seeking Views On Carbon Tax

    $60 Million From Federal Carbon Tax To Go To Green Projects In Schools

    $60 Million From Federal Carbon Tax To Go To Green Projects In Schools
    OTTAWA — A portion of the proceeds of the federal carbon tax will go to fund green projects at schools in four provinces, but the fate of the program depends on the co-operation of those provinces' conservative premiers.

    $60 Million From Federal Carbon Tax To Go To Green Projects In Schools