Close X
Thursday, November 28, 2024
ADVT 
National

Nearly 390 Kilometres Of Highway Improvements In Northern B.C.

Darpan News Desk , 22 Jul, 2019 08:19 PM

    Crews are starting work on a highway resurfacing project on Highway 37 between Stewart and Dease Lake, making the drive safer and smoother for travellers.


    This is one of nine major highway projects in northern B.C. that cover nearly 390 kilometres of highways and side roads.


    “We are hard at work in northern B.C. this summer, paving roadways and building essential infrastructure,” said Claire Trevena, Minister of Transportation and Infrastructure. “These important projects will make a big difference to local people and those travelling through the region.”


    This $7.9-million project includes approximately 27 kilometres of resurfacing along Highway 37, starting about 60 kilometres north of the Meziadin Junction and continuing north to Burrage Air Strip.


    The contractor, Pittman Asphalt of Prince George, will work to minimize traffic disruptions for people who live and work in this area.


    There are eight other major resurfacing projects taking place in northern B.C. this summer:


    Highway 97 (near Fort St. John): hot-in-place recycling for 45 kilometres of Highway 97, 10 kilometres of Beatton Airport Road and seven kilometres of 271 Road.


    Highway 97 (near Taylor): overlay asphalt resurfacing for 6.5 kilometres of Highway 97 from North Taylor Hill to the intersection of Swanson Road and Lumber Road, as well as a total of seven kilometres on various Peace District side roads.


    Highway 97 (near Dawson Creek): hot-in-place resurfacing for 52.8 kilometres of Highway 97 from East Pine Road to Road 247.


    Highway 52 (near Tumbler Ridge): sealcoating for 58.9 kilometres of Highway 52, from Junction 29 to Rat Lake Road.


    Highways 16 and 97 (near Prince George): mill and fill asphalt resurfacing for 34.2 kilometres of Highway 16 from Hooper Road to Jutland Road and Highway 97 from 5th Avenue to North Kelly Road.


    Highway 16 (near Burns Lake): mill and fill asphalt resurfacing for 36.4 kilometres of Highway 16 from Endako to Fort Fraser and Burns Lake Arterial.


    Highway 16 (near Telkwa): sealcoating for 34.7 kilometres of Highway 16 from Tower Road to Wakefield Road and on Babine Lake Road.


    Highway 16 (near Hazelton): sealcoating for 68.5 kilometres of Highway 16 from Boulder Creek West to New Hazelton and along the Kispiox Valley Road.
    Highway resurfacing improves the safety and efficiency of the roadway, provides safer driving conditions for the travelling public and improves the movement of goods and services.


    In total, there are 20 major highway and related infrastructure projects underway in northern B.C., representing an investment of nearly $154 million.

    MORE National ARTICLES

    Driver In Fatal Coquitlam Tesla Crash Was Impaired, Driving 150 Km/h In A 60 Zone, Mounties Say

    A Coquitlam RCMP investigation has found that impairment and speed, not mechanical or computer failure, were the decisive factors in a fatal, single-vehicle crash earlier this year involving a Tesla.

    Driver In Fatal Coquitlam Tesla Crash Was Impaired, Driving 150 Km/h In A 60 Zone, Mounties Say

    Police Recover $300,000 In Stolen Goods From Abbotsford Property

    Police Recover $300,000 In Stolen Goods From Abbotsford Property
    On July 8, 2019, Abbotsford Police patrol officers observed a stolen flat deck truck transporting an excavator onto a residential property in the 1200 blk of Columbia Road.    

    Police Recover $300,000 In Stolen Goods From Abbotsford Property

    New Driver Charged After Going 107 Kilometres Over Speed Limit On Abbotsford Highway

    New Driver Charged After Going 107 Kilometres Over Speed Limit On Abbotsford Highway
    An 18-year-old male (“N” driver) has been charged with excessive speeding after being caught allegedly driving 187 km/hr on Highway 11.

    New Driver Charged After Going 107 Kilometres Over Speed Limit On Abbotsford Highway

    Once Driven Near Extinction, Wild Turkeys Making Themselves At Home In Quebec

    They arrived a few years ago — three-foot tall, bare-headed visitors that would occasionally stare intently at residents from their balconies and yards.

    Once Driven Near Extinction, Wild Turkeys Making Themselves At Home In Quebec

    Forest Fire Threatening Pikangikum Grows In Size, Airlifts Continue

    Forest Fire Threatening Pikangikum Grows In Size, Airlifts Continue
    A forest fire threatening a First Nation in northwestern Ontario has grown in size, officials said Thursday as more flights were planned to airlift residents out of the community.

    Forest Fire Threatening Pikangikum Grows In Size, Airlifts Continue

    More 'Work To Do' To Mobilize Canadians On Climate Change Action: Trudeau

    More 'Work To Do' To Mobilize Canadians On Climate Change Action: Trudeau
    Prime Minister Justin Trudeau says he has more work to do to sell Canadians on his vision for more action to fight climate change.

    More 'Work To Do' To Mobilize Canadians On Climate Change Action: Trudeau