Close X
Thursday, October 10, 2024
ADVT 
National

NDP Orders Independent Review Of George Massey Tunnel Project In Metro Vancouver

The Canadian Press, 07 Sep, 2017 10:16 AM
    VANCOUVER — British Columbia's government is putting a $3.5 billion bridge project on hold while an independent technical review is done to determine the best option for replacing a Metro Vancouver highway tunnel.
     
    Transportation Minister Claire Trevena said the congested George Massey Tunnel connecting Richmond and Delta on Highway 99 under the Fraser River is a roadblock to a strong economy.
     
    She said the review would consider whether the previous Liberal government's plan for a 10-lane bridge would be the best option or if the solution is a smaller crossing, repairs to the existing tunnel, a twinned tunnel or a combination of those ideas.
     
    Trevena said the Liberals didn't have "buy-in" from mayors and people who live and work in the region, and that "social licence" is needed to proceed with any replacement project.
     
    "The sense was that there was not a thorough business case or a look at all the options," she said in a conference call Wednesday.
     
    "The feedback on the 10-lane bridge I heard was very strong opposition from many, many quarters."
     
     
    A timeline for the review has not been established, but Trevena said it would consider technical work already done on the project that has cost $70 million so far, including for site preparation that involves uprooted trees along the highway.
     
    Companies that began work on the bridge will be compensated and a new process would start following the review, she said.
     
    "The procurement terms allow for the teams to be compensated for up to $2 million to cover for a portion of their costs so that is going to be up to $4 million," Trevena said of the money that's included in the $70-million price tag.
     
    Then-premier Christy Clark announced the construction of the bridge before the 2013 provincial election, and the New Democrats, who took office in July, said they would review the project.
     
     
    A statement from Liberal Opposition members said they are concerned that the government is cancelling the project and putting the safety of commuters at risk in order to protect its political agenda.
     
    "This is an unacceptable delay for those who travel through the tunnel every day," said Delta South member of the legislature Ian Paton in a statement.
     
    "This will cost taxpayers millions right now and likely billions when the NDP realize a new crossing, a bridge, is needed."
     
    Richmond city council has urged the province to stop any plans for a bridge, saying it would impact agricultural land and worsen traffic north of the route at the Oak Street Bridge connecting commuters to Vancouver.
     
    Instead, Richmond has called for a twinned tunnel that would also include pathways for cyclists and pedestrians, the same as what was proposed for a bridge.
     
    However, Delta has made its case for a 10-lane bridge, saying that while the existing tunnel has been seismically upgraded, it wouldn't withstand an earthquake beyond 6.5 magnitude.

    MORE National ARTICLES

    Young Man Stabbed Inside East Vancouver Grocery Store

    Young Man Stabbed Inside East Vancouver Grocery Store
    Just before 4 p.m. a man was stabbed inside of the No Frills store located at 1460 East Hastings Street. 

    Young Man Stabbed Inside East Vancouver Grocery Store

    Post Punjab & Goa, A Changes Strategy: 'No Modi-Bashing'

    Post Punjab & Goa, A Changes Strategy: 'No Modi-Bashing'
    Another reason behind not targeting Modi in the MCD polls is the massive victory the BJP scored in Uttar Pradesh and Uttarakhand.

    Post Punjab & Goa, A Changes Strategy: 'No Modi-Bashing'

    No Threat After Message On Social Media Warns Students Of Delta School

    No Threat After Message On Social Media Warns Students Of Delta School
    Police Was Called In After Word Of A Threat Linked To A Delta School Was Posted On Social Media

    No Threat After Message On Social Media Warns Students Of Delta School

    New Westminster Man Wanted On 4 Warrants Found Hiding In Broom Closet

    New Westminster Man Wanted On 4 Warrants Found Hiding In Broom Closet
    On April 11th 2017 at approximately 11:10am, New Westminster Police were looking for 37 year old New Westminster resident Darryl Shane McIntyre in the 700 block of 5th Avenue. 

    New Westminster Man Wanted On 4 Warrants Found Hiding In Broom Closet

    Indian Billionaire Anil Agarwal Buys 11.4 Per Cent Of Miner Anglo American, Becomes 2nd Largest Hold

    Indian Billionaire Anil Agarwal Buys 11.4 Per Cent Of Miner Anglo American, Becomes 2nd Largest Hold
    Indian metals-to-mining magnate Anil Agarwal has acquired an over 11 per cent stake in British mining company Anglo American, according to a London Stock Exchange notice.

    Indian Billionaire Anil Agarwal Buys 11.4 Per Cent Of Miner Anglo American, Becomes 2nd Largest Hold

    Toronto Man Sues Elevator Company Over Mishap In Condo; Says He Hurt Leg In Fall

    Toronto Man Sues Elevator Company Over Mishap In Condo; Says He Hurt Leg In Fall
    n his unproven statement of claim before Ontario Superior Court, Kenneth Smookler seeks $25,000 in compensation from Schindler Elevator and his Toronto condo corporation for what he alleges was their failure to maintain the device properly.

    Toronto Man Sues Elevator Company Over Mishap In Condo; Says He Hurt Leg In Fall