Close X
Wednesday, October 9, 2024
ADVT 
National

NDP Orders Independent Review Of George Massey Tunnel Project In Metro Vancouver

The Canadian Press, 07 Sep, 2017 10:16 AM
    VANCOUVER — British Columbia's government is putting a $3.5 billion bridge project on hold while an independent technical review is done to determine the best option for replacing a Metro Vancouver highway tunnel.
     
    Transportation Minister Claire Trevena said the congested George Massey Tunnel connecting Richmond and Delta on Highway 99 under the Fraser River is a roadblock to a strong economy.
     
    She said the review would consider whether the previous Liberal government's plan for a 10-lane bridge would be the best option or if the solution is a smaller crossing, repairs to the existing tunnel, a twinned tunnel or a combination of those ideas.
     
    Trevena said the Liberals didn't have "buy-in" from mayors and people who live and work in the region, and that "social licence" is needed to proceed with any replacement project.
     
    "The sense was that there was not a thorough business case or a look at all the options," she said in a conference call Wednesday.
     
    "The feedback on the 10-lane bridge I heard was very strong opposition from many, many quarters."
     
     
    A timeline for the review has not been established, but Trevena said it would consider technical work already done on the project that has cost $70 million so far, including for site preparation that involves uprooted trees along the highway.
     
    Companies that began work on the bridge will be compensated and a new process would start following the review, she said.
     
    "The procurement terms allow for the teams to be compensated for up to $2 million to cover for a portion of their costs so that is going to be up to $4 million," Trevena said of the money that's included in the $70-million price tag.
     
    Then-premier Christy Clark announced the construction of the bridge before the 2013 provincial election, and the New Democrats, who took office in July, said they would review the project.
     
     
    A statement from Liberal Opposition members said they are concerned that the government is cancelling the project and putting the safety of commuters at risk in order to protect its political agenda.
     
    "This is an unacceptable delay for those who travel through the tunnel every day," said Delta South member of the legislature Ian Paton in a statement.
     
    "This will cost taxpayers millions right now and likely billions when the NDP realize a new crossing, a bridge, is needed."
     
    Richmond city council has urged the province to stop any plans for a bridge, saying it would impact agricultural land and worsen traffic north of the route at the Oak Street Bridge connecting commuters to Vancouver.
     
    Instead, Richmond has called for a twinned tunnel that would also include pathways for cyclists and pedestrians, the same as what was proposed for a bridge.
     
    However, Delta has made its case for a 10-lane bridge, saying that while the existing tunnel has been seismically upgraded, it wouldn't withstand an earthquake beyond 6.5 magnitude.

    MORE National ARTICLES

    Asylum Claims, RCMP Interceptions Down Slightly In April

    Asylum Claims, RCMP Interceptions Down Slightly In April
    OTTAWA — New figures released Monday show that in April, the total number of people intercepted by the RCMP crossing illegally into Canada fell, as did the total number of asylum claims overall.

    Asylum Claims, RCMP Interceptions Down Slightly In April

    Search Suspended For Fire Chief Missing From Cache Creek, B.C.

    Search Suspended For Fire Chief Missing From Cache Creek, B.C.
    ASHCROFT, B.C. — Police say the search has been suspended for a fire chief believed to have been swept away by high flood waters in British Columbia's interior.

    Search Suspended For Fire Chief Missing From Cache Creek, B.C.

    Ontario's Sikh Politician Jagmeet Singh To Shake Up Federal NDP Leadership Race

    Ontario's Sikh Politician Jagmeet Singh To Shake Up Federal NDP Leadership Race
    Should he be successful, Singh — a turbaned Sikh — would break through a long-standing barrier at the federal level, one that really ought have been shattered long ago

    Ontario's Sikh Politician Jagmeet Singh To Shake Up Federal NDP Leadership Race

    Abbotsford Real Estate Appraiser Facing Child Porn Charges

    Abbotsford Real Estate Appraiser Facing Child Porn Charges
    A 33-year-old suspect named Joshua James KITSUL was identified inconnection to that internet account. Investigators executed a search warrant at KITSUL’s residence on April 28, 2017, and seized numerous computers, data storage devices and cell phones. 

    Abbotsford Real Estate Appraiser Facing Child Porn Charges

    Residents In Okanagan Ready For Second Flood As Water Rises Elsewhere In B.C.

    Residents In Okanagan Ready For Second Flood As Water Rises Elsewhere In B.C.
    Residents dealing with homes damaged by flooding in Kelowna, B.C., have walled off their properties with six to seven layers of sandbags in preparation for another threat of rising water.

    Residents In Okanagan Ready For Second Flood As Water Rises Elsewhere In B.C.

    One Suspect In Custody After Targeted Double Shooting In Burnaby Sends Two To Hospital

    One Suspect In Custody After Targeted Double Shooting In Burnaby Sends Two To Hospital
    On May 11, 2017, at approximately 6 p.m., Burnaby RCMP was called to the 6700-block of Broadway Avenue after receiving a report of a shooting.

    One Suspect In Custody After Targeted Double Shooting In Burnaby Sends Two To Hospital