Inadequate Design Blamed For Failure Of B.C. Tailings Dam

Darpan News Desk The Canadian Press, 30 Jan, 2015 10:47 AM
    VICTORIA — A government-ordered report says a tailings spill at a B.C. mine was caused by an inadequately designed dam that caused its foundation to fail.
     
    The tailings dam at the Mount Polley mine burst last August, sending 24 million cubic metres of mine silt and water gushing into nearby rivers and lakes.
     
    Norbert Morgenstern, chairman of the panel that investigated the spill, says evidence indicates there was a glacial lake deposit under the foundation of the dam.
     
    The report says the dam's design didn't take into account the glacial environment, causing the foundation to fail when it was subjected to heavy stress.
     
    Morgenstern says there were no warning signs that could have foreshadowed the dam's failure.
     
    The provincial government appointed a panel of three geotechnical experts to investigate the cause of the collapse and the role of government regulation and oversight.
     
    Significant Events Related To A Tailings Spill At B.C.'s Mount Polley Mine
     
     
    A timeline of events related to the failure of a tailings dam at the Mount Polley gold and copper mine southeast of Quesnel, B.C.:
     
    Aug. 4, 2014: The mine's tailings dam bursts without warning at 1 a.m., sending 24 million cubic metres of mine silt and water spilling into nearby lakes and rivers.
     
    Aug. 6: The B.C. government orders mine owner Imperial Metals Corp. (TSX:III) to immediately stop the release of toxic material into surrounding waterways. Imperial Metals president apologizes to residents of Likely, B.C., who live downstream and are affected by water-use ban.
     
    Aug. 8: A drinking-water ban is partially lifted as initial test results show water is within human health guidelines.
     
    Aug. 9: The province announces a dramatic drop in the amount of material leaking from the breached pond, but says one creak is still 45 metres wide in some areas, up from original width of one metre.
     
    Aug. 12: The drinking-water ban is almost entirely lifted with the exception of largely uninhabited areas in the direct vicinity of the spill.
     
    Aug. 18: The B.C. government appoints an independent panel to investigate the spill, while also ordering every mining operation in the province to conduct safety inspections.
     
    Aug. 19: The spill prompts the Canadian Nuclear Safety Commission requests a series of safety checks at uranium facilities with tailings ponds.
     
    Nov. 5: With the Mount Polley spill overshadowing plans to expand the province's mining industry, B.C. Mines Minister Bill Bennett visits Anchorage, Alaska, to meet with state officials, fishing organizations and aboriginal groups to address their concerns.
     
    Nov. 24: The province releases a progress report on the Mount Polley cleanup, warning that it will take years to undo the damage caused by the spill.
     
    Dec. 18: B.C.'s chief mines inspector allows Imperial Metals to begin repairs on the Mount Polley tailings pond to deal with the impact of increased water flow from melting spring snow.
     
    Jan. 30, 2015: A report by independent experts blames the spill on poor design.

    MORE National ARTICLES

    TSB report says 'unprecedented' flood at root of Calgary bridge failure

    TSB report says 'unprecedented' flood at root of Calgary bridge failure
    CALGARY — The Transportation Safety Board says unprecedented flood water was to blame for a derailment and partial bridge collapse in Calgary last year.

    TSB report says 'unprecedented' flood at root of Calgary bridge failure

    Alberta cabinet minister says he has 'open mind' on Wildrose floor-crossers

    Alberta cabinet minister says he has 'open mind' on Wildrose floor-crossers
    EDMONTON — Alberta Premier Jim Prentice's caucus is discussing a bid by as many as seven official Opposition members to cross the floor — and at least one cabinet minister says he's keeping an "open mind."

    Alberta cabinet minister says he has 'open mind' on Wildrose floor-crossers

    B.C. Government Approves Construction Of Contentious $8.8 Billion Site C Dam On The Peace River

    B.C. Government Approves Construction Of Contentious $8.8 Billion Site C Dam On The Peace River
    VICTORIA — The British Columbia government has approved its most expensive mega project with the construction of an $8.8 billion dam on the Peace River that Premier Christy Clark says marks a historic milestone that will be felt for a century.

    B.C. Government Approves Construction Of Contentious $8.8 Billion Site C Dam On The Peace River

    B.C. Court Convicts Alleged Hells Angel Of Extortion And Theft Over $5,000

    B.C. Court Convicts Alleged Hells Angel Of Extortion And Theft Over $5,000
    Neil MacKenzie of B.C.'s Criminal Justice Branch says the case against Robert Widdifield went to trial in the fall and a decision was handed down in Nanaimo, B.C., on Tuesday.

    B.C. Court Convicts Alleged Hells Angel Of Extortion And Theft Over $5,000

    Ontario man charged in alleged US$70m scheme after arriving at Pearson airport

    Ontario man charged in alleged US$70m scheme after arriving at Pearson airport
    HUNTSVILLE, Ont. — An Ontario man charged by American authorities four years ago in an alleged US$70 million Ponzi scheme has been arrested after arriving at Toronto's Pearson International airport.

    Ontario man charged in alleged US$70m scheme after arriving at Pearson airport

    Woman pleads guilty to spiriting away sheep from quarantined Ontario farm

    Woman pleads guilty to spiriting away sheep from quarantined Ontario farm
    PETERBOROUGH, Ont. — One of four people charged in the disappearance of 31 rare sheep east of Toronto has been convicted of transporting an animal under quarantine.

    Woman pleads guilty to spiriting away sheep from quarantined Ontario farm