Close X
Friday, November 15, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Man convicted of 15 charges related to frauds: Surrey RCMP

Man convicted of 15 charges related to frauds: Surrey RCMP
Clayton Brooks Hayden plead guilty to 15 fraud related charges and was sentenced on November 16, 2021. He received a sentence of 15 months jail time, two years probation and was ordered to pay restitution to all 15 victims on the offences he plead guilty to.

Man convicted of 15 charges related to frauds: Surrey RCMP

Vancouver penthouse party host back in jail

Vancouver penthouse party host back in jail
Investigators discovered that Mohammed Movassaghi, 43, was running an illegal booze can and show lounge inside his 1,100-square-foot penthouse, packing it with hundreds of people, and violating Covid-19 health orders.

Vancouver penthouse party host back in jail

B.C. fruit and vegetable growers face uncertainty

B.C. fruit and vegetable growers face uncertainty
Sandhu's family came to Canada in the early 1960s and began farming about a decade later. Today, the 27-year-old and his parents grow a variety of berries and vegetables across about 120 hectares, while several other relatives have farms nearby in the Abbotsford area.

B.C. fruit and vegetable growers face uncertainty

New COVID-19 variant sparks border concerns

New COVID-19 variant sparks border concerns
Conservative Leader Erin O'Toole has called for the government to immediately strengthen border screening in the face of a highly mutated new variant of COVID-19. The World Health Organization will meet Friday to discuss variant B.1.1.529, which originated in South Africa.

New COVID-19 variant sparks border concerns

B.C. braces for more rain as PM to see flood zone

B.C. braces for more rain as PM to see flood zone
Rainstorms of increasing intensity are forecast to hit British Columbia over the coming days, prompting warnings for people to be prepared to evacuate. Public Safety Minister Mike Farnworth said the biggest storm is expected to arrive Tuesday and people living in areas prone to flooding should be on alert.

B.C. braces for more rain as PM to see flood zone

Human remains in two separate investigations identified

Human remains in two separate investigations identified
The two investigations are not connected and criminality is not believed to be a factor in either death. Both investigations have been turned over to BC Coroners Service. The families of the deceased men have been notified.

Human remains in two separate investigations identified