Close X
Friday, November 15, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Vancouver Police charge 50 year old man in stabbing incident

Vancouver Police charge 50 year old man in stabbing incident
VPD investigators believe the stabbing occurred last Friday afternoon, near Main and Hastings, after a confrontation between two men outside the community centre. Although the incident was not immediately reported to police, officers began investigating after the victim showed up at hospital with several serious stab wounds.

Vancouver Police charge 50 year old man in stabbing incident

970 COVID19 cases over 3 days

970 COVID19 cases over 3 days
There are currently 2,882 active cases of COVID-19 in the province, and 212,704 people who tested positive have recovered. Of the active cases, 303 individuals are currently in hospital and 115 are in intensive care. The remaining people are recovering at home in self-isolation.

970 COVID19 cases over 3 days

Early morning shootings in Surrey land two men in hospital

Early morning shootings in Surrey land two men in hospital
Surrey RCMP is informing the public of three separate shootings that occurred over the weekend. While it is too early to conclusively determine a motive, all three shootings appear to be targeted, and investigators are exploring  links to criminal activity and the drug trade.

Early morning shootings in Surrey land two men in hospital

Teen suspect arrested after woman, dog stabbed

Teen suspect arrested after woman, dog stabbed
A teenaged boy from South Vancouver could face criminal charges, after a woman and her dog were stabbed with a knife near the Marine Drive Canada Line Station on Friday night.

Teen suspect arrested after woman, dog stabbed

Province extends Fuel order & provincial state of emergency to Dec 14, 2021

Province extends Fuel order & provincial state of emergency to Dec 14, 2021
B.C. is prioritizing gasoline and diesel for essential vehicles, while working to keep fuel available for people in B.C. Under the EPA, an order restricting the purchase of vehicle fuel in certain regions of the province is in place until December 14 at midnight. 

Province extends Fuel order & provincial state of emergency to Dec 14, 2021

Apology for military misconduct set for Dec. 13

Apology for military misconduct set for Dec. 13
A date has been set for the government to deliver its promised apology to victims of military sexual misconduct. The Department of National Defence announced Monday that the apology will be delivered on Dec. 13 and come in the three parts.

Apology for military misconduct set for Dec. 13