Close X
Friday, November 15, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Afghan refugee exodus may take two years: minister

Afghan refugee exodus may take two years: minister
Immigration Minister Sean Fraser says the government predicts it could take two years to fulfil its promise of bringing 40,000 Afghan refugees to Canada. The minister said the government is facing challenges in Afghanistan and other countries where refugees have fled but is trying to get them to Canada urgently.    

Afghan refugee exodus may take two years: minister

One cracked Cyclone helicopter repaired: military

One cracked Cyclone helicopter repaired: military
The Royal Canadian Air Force issued a statement saying Sikorsky Aircraft, the U.S.-based manufacturer of the aircraft, has devised a fix that involves the installation of reinforcements to provide additional strength to the helicopter's airframe.

One cracked Cyclone helicopter repaired: military

B.C. home loss prompts calls for tax sale changes

B.C. home loss prompts calls for tax sale changes
Jay Chalke's report says the 60-year-old woman had the money to cover the tax bill but personal challenges made it difficult to pay and the City of Penticton sold the home in 2017 for $150,000, costing her about $270,000 in equity.

B.C. home loss prompts calls for tax sale changes

Man who barricaded himself inside Surrey home taken into custody

Man who barricaded himself inside Surrey home taken into custody
Surrey RCMP were called at 8:40am on Wednesday in relation to a man barricading himself inside a home in the 14100-block of 114A Avenue. The male is in police custody and has been arrested under the Mental Health Act. He has been transported to local hospital.

Man who barricaded himself inside Surrey home taken into custody

Democracy summit: 'It's a really dangerous time'

Democracy summit: 'It's a really dangerous time'
Government officials from 110 countries, including Canada, as well as business leaders and civil-society advocates and activists will gather for a two-day virtual "Summit for Democracy" aimed at slowing the march of authoritarianism.

Democracy summit: 'It's a really dangerous time'

Bank of Canada keeps key interest rate on hold

Bank of Canada keeps key interest rate on hold
The Bank of Canada is keeping its key interest rate target on hold at its rock-bottom level of 0.25 per cent. In a statement, the central bank also said Wednesday it doesn't expect to raise the trendsetting rate until some time between April and September next year, which is unchanged from its previous guidance.

Bank of Canada keeps key interest rate on hold