Close X
Thursday, November 14, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Charges laid against Abbotsford and Calgary residents after a series of robberies

Charges laid against Abbotsford and Calgary residents after a series of robberies
Charges have been laid against a 22-year-old Abbotsford resident and a 21-year-old Calgary resident after a joint investigation into a robbery series that occurred in Surrey, Langley, and Abbotsford. Between October 2, 2021 and October 11, 2021, three robberies in three different jurisdictions occurred.

Charges laid against Abbotsford and Calgary residents after a series of robberies

Charge laid in New Year's Eve death of B.C. woman

Charge laid in New Year's Eve death of B.C. woman
RCMP on Vancouver Island say a 27-year-old man has been charged with one count of second-degree murder following a slaying in Langford, B.C. An unnamed woman was found dead in a home during a wellness check on Dec. 31.

Charge laid in New Year's Eve death of B.C. woman

CEOs paid at second-highest level during pandemic

CEOs paid at second-highest level during pandemic
In 2020, as many Canadians had hours cut or lost their jobs completely during repeated lockdowns and forced closures, the highest-paid 100 CEOs at publicly traded companies earned an average of $10.9 million. That was down from the record high of $11.8 million in 2018, but an increase of $95,000 compared with 2019.

CEOs paid at second-highest level during pandemic

Trudeau gets COVID-19 booster shot in Ottawa

Trudeau gets COVID-19 booster shot in Ottawa
Prime Minister Justin Trudeau has joined the ranks of Canadians who are rolling up their sleeves for COVID-19 booster shots. Trudeau received his third shot at an Ottawa pharmacy this morning.

Trudeau gets COVID-19 booster shot in Ottawa

VPD makes arrest after meat cleaver pulled during mask dispute

VPD makes arrest after meat cleaver pulled during mask dispute
The 23-year-old suspect was shopping at a Robson Street grocery store Monday morning when a staff member noticed he wasn’t wearing a mask. When the employee insisted the shopper mask up, the man allegedly pulled a knife, threatened the worker, then left the store without paying for his groceries.

VPD makes arrest after meat cleaver pulled during mask dispute

Frigid cold again grips parts of B.C.

Frigid cold again grips parts of B.C.
Conditions along the north and central coast also feel as cold as -20 C due to the wind chill, while winter storm watches warn of up to 20 centimetres of snow over northern Vancouver Island and the central coast through Thursday.

Frigid cold again grips parts of B.C.