Close X
Thursday, September 19, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Kevin Falcon wins B.C. Liberal leadership race

Kevin Falcon wins B.C. Liberal leadership race
Falcon won on the fifth ballot, taking just over 52 per cent of the points available in a sometimes fractious leadership race where the former minister appeared to be the focus of attacks as the perceived front-runner.

Kevin Falcon wins B.C. Liberal leadership race

Lifting COVID measures requires balance: Tam

Lifting COVID measures requires balance: Tam
Vaccine mandates are not meant to be a punishment, federal Health Minister Jean-Yves Duclos said Friday at the briefing. Rather they are meant to protect people and incentivize them to get vaccinated against COVID-19.

Lifting COVID measures requires balance: Tam

GoFundMe cancels Ottawa protest fundraiser

GoFundMe cancels Ottawa protest fundraiser
The move could deny participants a vital source of funds as Ottawa braces for a new wave of protesters slated to arrive in the national capital this weekend. GoFundMe says it supports peaceful protest and that it believes that was the initial intention of the Ottawa event.    

GoFundMe cancels Ottawa protest fundraiser

Canfor unions reach deal setting pattern in West

Canfor unions reach deal setting pattern in West
Unifor and the Public and Private Workers of Canada say the four-year deal for 900 workers at Canfor will provide a $5,000 signing bonus plus wage increases of 2.5 per cent, 2.5 per cent, and three per cent in the following three years.

Canfor unions reach deal setting pattern in West

1,799 COVID19 cases for Friday

1,799 COVID19 cases for Friday
There are currently 25,479 active cases of COVID-19 in the province, and 301,573 people who tested positive have recovered. Of the active cases, 946 COVID-positive individuals are currently in hospital and 139 are in intensive care. The remaining people are recovering at home in self-isolation.

1,799 COVID19 cases for Friday

Experts say not to rush nixing vaccine passports

Experts say not to rush nixing vaccine passports
Prevalence of cases among both vaccinated and unvaccinated Canadians has led to calls to nix the vaccine passport system by some who question whether the shots make a difference in transmission.

Experts say not to rush nixing vaccine passports