Close X
Sunday, November 24, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Quebec to impose tax on unvaxxed

Quebec to impose tax on unvaxxed
Premier Francois Legault made the announcement as the province reported another daily record for virus-related hospitalizations. Of the 2,742 patients in Quebec hospitals with COVID-19 on Tuesday, 255 of them were in intensive care.

Quebec to impose tax on unvaxxed

Businesses eye rethink of parental leave in EI

Businesses eye rethink of parental leave in EI
It's an idea that has been floated previously, to hive off the special benefits for new parents from the EI system, given the growth in demand for the leaves, although how to finance it has been a key stumbling block. 

Businesses eye rethink of parental leave in EI

Zelenskyy talks Russia sanctions with Trudeau

Zelenskyy talks Russia sanctions with Trudeau
Zelenskyy delivered that message to Trudeau in their Tuesday morning telephone call, which came on the eve of a key meeting in Brussels between the 30-country NATO alliance and Russia.

Zelenskyy talks Russia sanctions with Trudeau

Slim majority support lockdowns amid Omicron

Slim majority support lockdowns amid Omicron
56 per cent of respondents in the poll conducted by Leger and the Association of Canadian Studies agreed governments are making the right decisions to limit the spread of Omicron and keep the health system from being overrun.    

Slim majority support lockdowns amid Omicron

Canada can supply potential 4th doses: Trudeau

Canada can supply potential 4th doses: Trudeau
Trudeau made the pledge in a statement issued late Monday after he spoke with provincial and territorial leaders, saying Ottawa will do all it can to help them cope with the fifth wave of the pandemic.

Canada can supply potential 4th doses: Trudeau

First wave of intense rainstorm reaches B.C.

First wave of intense rainstorm reaches B.C.
The latest atmospheric river to wash over British Columbia was expected to soak parts of the south coast with as much as 150 millimetres of rain in a series of waves that won't relent until Thursday, Environment Canada said. Rainfall warnings covered the west coast of Vancouver Island and the inner south coast, including Metro Vancouver and the Fraser Valley.

First wave of intense rainstorm reaches B.C.