Close X
Friday, September 20, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Rainstorms slink out of B.C., leaving few effects

Rainstorms slink out of B.C., leaving few effects
Environment Canada had warned this week's series of rain events would bring deluges of 50 to 150 millimetres over much of southern B.C., but preliminary measurements show conditions were not as intense.

Rainstorms slink out of B.C., leaving few effects

B.C. overdose calls rose by 31 per cent in 2021

B.C. overdose calls rose by 31 per cent in 2021
Paramedics and medical dispatchers in B.C. responded to a record-setting 35,525 overdose calls last year. BC Emergency Health Services says paramedics attended an average of 97 overdose calls a day last year, a 31 per cent increase compared with 2020.

B.C. overdose calls rose by 31 per cent in 2021

Delays increase cost to rebuild Lytton, B.C.

Delays increase cost to rebuild Lytton, B.C.
Insurance losses from a wildfire that wiped out most of Lytton, B.C., have surged to $102 million. The Insurance Bureau of Canada says the amount has risen from an original estimate of $78 million mostly because of delays in rebuilding the village.

Delays increase cost to rebuild Lytton, B.C.

B.C. school district wants staff proof of vaccine

B.C. school district wants staff proof of vaccine
The school board in Delta, B.C., is requiring all its employees to show proof of vaccination for COVID-19 and is giving them less than two months to disclose their status.  Board chair Val Windsor says it is taking the step to reduce the risk of staff and students getting COVID-19.

B.C. school district wants staff proof of vaccine

Burnaby RCMP need your help in locating missing woman Reshmi Mani

Burnaby RCMP need your help in locating missing woman Reshmi Mani
Reshmi is a South Asian woman and 52 years old. Reshmi’s family and friends, as well as police, are concerned about Reshmi’s well-being and are asking the public to share the information provided above.

Burnaby RCMP need your help in locating missing woman Reshmi Mani

Fourth doses not yet needed for most: experts

Fourth doses not yet needed for most: experts
Prime Minister Justin Trudeau said Monday that the country will have enough third and fourth doses for all eligible Canadians — if or when they're needed — with contracts signed through 2024 with Pfizer-BioNTech and Moderna.

Fourth doses not yet needed for most: experts