Close X
Friday, September 20, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Ship at 'high' readiness for NATO mission: admiral

Ship at 'high' readiness for NATO mission: admiral
Due to COVID-19 restrictions, families weren't permitted on the wharf in Halifax for the traditional sendoff as the HMCS Montreal pulled away from the jetty and its 240 crew members set off for the six-month deployment.

Ship at 'high' readiness for NATO mission: admiral

Annual inflation hits 30-year high in December

Annual inflation hits 30-year high in December
Statistics Canada reported Wednesday that the annual pace of inflation climbed in December to 4.8 per cent, a pace that hasn't been seen since September 1991.

Annual inflation hits 30-year high in December

B.C. welcomes more than 200 Afghan refugees

B.C. welcomes more than 200 Afghan refugees
Sean Fraser, Canada's minister responsible for refugees, says the latest arrivals are among a total of 7,000 refugees that have now been airlifted to various parts of Canada.

B.C. welcomes more than 200 Afghan refugees

Two people injured in Whalley shooting

Two people injured in Whalley shooting
On January 19, 2022 shortly after 3:00 a.m. Surrey RCMP responded to the report of shots fired inside a warming center in the 10600-block of King George Boulevard. Two people were located with injuries believed to be gunshot wounds. Both victims were transported to hospital with non-life-threatening injuries and have since been released.

Two people injured in Whalley shooting

B.C. company fined $75,000 over shark fins

B.C. company fined $75,000 over shark fins
Environment and Climate Change Canada says in a news release that Hang Hing Herbal Medicine Ltd. was fined $75,000 for importing an endangered species without a permit.    

B.C. company fined $75,000 over shark fins

1,975 COVID19 cases for Tuesday

1,975 COVID19 cases for Tuesday
There are 37,167 active cases of COVID-19 in the province, and 258,417 people who tested positive have recovered. Of the active cases, 854 COVID-positive individuals are in hospital and 112 are in intensive care. The remaining people are recovering at home in self-isolation.

1,975 COVID19 cases for Tuesday