Close X
Friday, September 20, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Canadian trial suggests benefits of remdesivir

Canadian trial suggests benefits of remdesivir
A Canadian study suggests the antiviral medication remdesivir could have a "modest but significant effect" on COVID-19 patient outcomes, including decreasing the need for mechanical ventilation by approximately 50 per cent. The study, published Wednesday in the Canadian Medical Association Journal, is billed as the largest single-country trial of remdesivir reported to date.

Canadian trial suggests benefits of remdesivir

B.C. doubles relief grants for certain businesses

B.C. doubles relief grants for certain businesses
A statement from the Ministry of Jobs, Economic Recovery and Innovation says businesses including event venues, bars, nightclubs and lounges that don't serve full meals are eligible for grants of up to $20,000, based on staffing levels.

B.C. doubles relief grants for certain businesses

Woman thrown against wall of hotel by attacker in Downtown: VPD

Woman thrown against wall of hotel by attacker in Downtown: VPD
The victim, a 22-year-old woman, was walking along West Georgia Street in front of Hotel Georgia when she was suddenly grabbed by a man, walking in the opposite direction, on December 31 at around 3:30 p.m. She was thrown against the exterior wall of the hotel and held down.

Woman thrown against wall of hotel by attacker in Downtown: VPD

Antiviral on its way to provinces and territories

Antiviral on its way to provinces and territories
Prime Minister Justin Trudeau says the first shipment of an oral COVID-19 pill is making its way across Canada but is no substitute for vaccination against the rapidly spreading virus. The anti-viral drug Paxlovid is meant to protect against hospitalization and death.

Antiviral on its way to provinces and territories

Unvaccinated military face uphill battle: lawyer

Unvaccinated military face uphill battle: lawyer
Controversy over mandatory vaccinations for the military has re-emerged during the pandemic, with chief of the defence staff Gen. Wayne Eyre ordering all personnel to be inoculated against COVID-19.

Unvaccinated military face uphill battle: lawyer

PBO report questions need for stimulus spending

PBO report questions need for stimulus spending
In a report this morning, Yves Giroux says the federal guardrails designed to guide spending decisions appear to have been met, suggesting any stimulus should be wound down before the fiscal year ends in March.

PBO report questions need for stimulus spending