Close X
Sunday, November 24, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Surrey RCMP make arrest for alleged personal robbery inside the ATM area of a Newton bank

Surrey RCMP make arrest for alleged personal robbery inside the ATM area of a Newton bank
On January 16, 2022, at 8:54 p.m., Surrey RCMP received the report of a personal robbery inside a bank in the 13600-block of 72 Avenue. The victim was depositing cash into the ATM when they were approached and allegedly robbed. 

Surrey RCMP make arrest for alleged personal robbery inside the ATM area of a Newton bank

Freeland asked to scrap carbon capture tax credit

Freeland asked to scrap carbon capture tax credit
More than 400 Canadian climate scientists and other academics are pleading with Finance Minister Chrystia Freeland to scrap her plan to create a tax credit for companies that build carbon capture and storage facilities. Freeland floated the idea of the tax credit in last year's federal budget and consultations to design it ended just before Christmas.

Freeland asked to scrap carbon capture tax credit

Canada Post seeking clarification on mask policy

Canada Post seeking clarification on mask policy
Canada Post says it is seeking "clarification" from the federal government about face masks after drawing criticism for refusing to let employees bring their own N95 masks to work. The Crown corporation earlier this week said employees had to use a Canada Post-issued cloth mask or disposable medical mask, or they would be sent home.

Canada Post seeking clarification on mask policy

Four people were hospitalized in three separate stabbings on the Downtown Eastside yesterday.

Four people were hospitalized in three separate stabbings on the Downtown Eastside yesterday.
In a statement, Supt. Duncan Pound of B.C.'s anti-gang squad says its investigations into the shootings in Langley, Surrey and Coquitlam — in which one person was killed and the bystanders were hurt — indicate they appear to be connected to the drug trade. 

Four people were hospitalized in three separate stabbings on the Downtown Eastside yesterday.

Russia cyber warning emerges amid Ukraine crisis

Russia cyber warning emerges amid Ukraine crisis
The Canadian Centre for Cyber Security, a branch of the Communications Security Establishment, said it was "aware of foreign cyber threat activities, including by Russian-backed actors, to target Canadian critical infrastructure network operators, their operational and information technology."

Russia cyber warning emerges amid Ukraine crisis

Canadian troops in Latvia at 'high readiness'

Canadian troops in Latvia at 'high readiness'
In an interview with The Canadian Press, Lt.-Col. Dan Richel says his 1,000-strong unit, which includes about 350 Canadian soldiers, is trained and equipped to help defend Latvian territory in the event of an attack.

Canadian troops in Latvia at 'high readiness'