Close X
Friday, September 20, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

School-based vaccination could be key: doctors

School-based vaccination could be key: doctors
While nearly three-quarters of kids in the Atlantic province have had their first shot, Health Canada says the national average is less than half — a shortfall that in-school vaccination programs could help address, says pediatric infectious disease physician Karina Top. 

School-based vaccination could be key: doctors

Smuggling arrest after bodies found near border

Smuggling arrest after bodies found near border
A Florida man has been charged with human smuggling after the bodies of four people, including a baby and a teen, were found in Manitoba near the United States border. The United States Attorney's Office for the District of Minnesota said Steve Shand, 47, appeared in court earlier Thursday.

Smuggling arrest after bodies found near border

B.C. flood victims eligible for new support Feb. 1

B.C. flood victims eligible for new support Feb. 1
The B.C. government says in a news release that beginning Feb. 1, evacuees receiving Emergency Support Services since the Nov. 15 storms will be offered the expanded help through the Canadian Red Cross.

B.C. flood victims eligible for new support Feb. 1

2,150 COVID19 cases for Thursday

2,150 COVID19 cases for Thursday
There are 34,835 active cases of COVID-19 in the province, and 265,765 people who tested positive have recovered. Of the active cases, 891 COVID-positive individuals are in hospital and 119 are in intensive care. The remaining people are recovering at home in self-isolation.    

2,150 COVID19 cases for Thursday

B.C. high school snuffs out wildfire logo

B.C. high school snuffs out wildfire logo
The Lillooet Secondary School administration says in a letter to families the wildfire logo holds a different meaning after the fatal blaze that burned through Lytton, and the nearby Elephant Hill fire in 2017 that destroyed more than 100 homes.

B.C. high school snuffs out wildfire logo

Amardip Singh Rai wanted on 17 charges including sexual assault

Amardip Singh Rai wanted on 17 charges including sexual assault
Amardip Singh Rai is described as a 42-year-old South Asian Male, 5’11, slim build, with brown eyes, black hair and often has facial hair. He has tattoos including roses on his hands, scroll with words on his neck, a cancer ribbon on his neck and a tiger on his chest.    

Amardip Singh Rai wanted on 17 charges including sexual assault