Close X
Wednesday, November 20, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

2 people in custody after a shooting and ramming of a police vehicle in Guildford Thursday: Surrey RCMP

2 people in custody after a shooting and ramming of a police vehicle in Guildford Thursday: Surrey RCMP
One male victim was transported to hospital with non-life threatening injuries believed to be from a gunshot wound.     

2 people in custody after a shooting and ramming of a police vehicle in Guildford Thursday: Surrey RCMP

Peace Arch Duty Free shop open now open for shopping after being closed over a year due to COVID19

Peace Arch Duty Free shop open now open for shopping after being closed over a year due to COVID19
The Canadian government on Monday, August 9th, amended the travel restrictions allowing all Americans who are fully vaccinated to enter Canada. The company expects to welcome American visitors at this time.

Peace Arch Duty Free shop open now open for shopping after being closed over a year due to COVID19

New draft plan envisions the future of Fleetwood supported by SkyTrain

New draft plan envisions the future of Fleetwood supported by SkyTrain
The area will be home to three future SkyTrain stations, including 152 Street, 160 Street and 166 Street. The plan will support the extension of the Expo Line SkyTrain to Langley and will better connect Fleetwood with the rest of Surrey and the Lower Mainland. 

New draft plan envisions the future of Fleetwood supported by SkyTrain

513 COVID19 cases for Thursday

513 COVID19 cases for Thursday
83.1% (3,596,148) of all eligible adults in B.C. have received their first dose and 73.3% (3,168,620) received their second dose.    

513 COVID19 cases for Thursday

Surrey RCMP need the public's help in locating missing man Balbir Brar

Surrey RCMP need the public's help in locating missing man Balbir Brar
UPDATE: Surrey RCMP are providing an update that the 64-year-old man reported missing on August 12, 2021, was located deceased. Criminality is not believed to be a factor in the male’s death and the investigation is being turned over to BC Coroner Service.  

Surrey RCMP need the public's help in locating missing man Balbir Brar

Surrey RCMP want the public's help in locating missing person- Andrea Gus

Surrey RCMP want the public's help in locating missing person- Andrea Gus
On August 8, 2021, Andrea Gus was reported missing by a family member. Andrea has been contact with family since the initial report, but has not responded to messages since August 10, 2021. 

Surrey RCMP want the public's help in locating missing person- Andrea Gus