Close X
Tuesday, November 19, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Vancouver Police recover $12K in stolen gold teeth

Vancouver Police recover $12K in stolen gold teeth
Police say this kind of gold is a scrap metal removed from people's mouths by dentists, and investigators believe it may have been taken during a break-and-enter at a dental office or at the home of someone who had been collecting it.

Vancouver Police recover $12K in stolen gold teeth

3 men arrested and a loaded gun seized thanks to help from the public: Surrey RCMP

3 men arrested and a loaded gun seized thanks to help from the public: Surrey RCMP
. All three suspects were arrested and further investigation led to seizure of a loaded handgun. All three of the men were identified by police and have ties to gang activity in the lower mainland.

3 men arrested and a loaded gun seized thanks to help from the public: Surrey RCMP

Canadian mission in Kabul has ended

Canadian mission in Kabul has ended
Canada's military mission in Afghanistan ended Thursday, leaving an unknown number of Canadians and their families trapped just hours before suicide bombers staged a "complex attack" on crowds at the airport in Kabul, killing more than a dozen U.S. soldiers and nearly 100 local Afghans.

Canadian mission in Kabul has ended

Group of LTC operators to mandate COVID vaccines

Group of LTC operators to mandate COVID vaccines
The group says employees who aren’t fully vaccinated as of Oct. 12 will be placed on unpaid leave of absence. Vaccination will also be required for new hires, students and other personnel working with the companies.

Group of LTC operators to mandate COVID vaccines

Afghanistan, pandemic cast a shadow over campaign

Afghanistan, pandemic cast a shadow over campaign
Party leaders hit the road last week just as the fourth wave began to surge and Kabul fell to the Taliban, prompting a desperate push to ramp up evacuation efforts for Canadian expats and former Afghan support staff at the capital's airport. That effort ended early Thursday morning.

Afghanistan, pandemic cast a shadow over campaign

Number of wildfires in B.C. falls below 250

Number of wildfires in B.C. falls below 250
The BC Wildfire Service says some of the major blazes — such as White Rock Lake, Tremont Creek and Lytton Creek — were still classified as out of control.

Number of wildfires in B.C. falls below 250