Close X
Tuesday, November 19, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Threatening note received at Langley Islamic Center

Threatening note received at Langley Islamic Center
Investigators have engaged the BC Hate Crime Unit and INSET (Integrated National Security Enforcement Team) to collaborate and are endeavouring to identify the author of the note and following all investigative avenues in this investigation.

Threatening note received at Langley Islamic Center

Burnaby RCMP ask for public assistance in identifying a suspect that may have been involved in3 unprovoked assaults

Burnaby RCMP ask for public assistance in identifying a suspect that may have been involved in3 unprovoked assaults
On Monday, August 30, at approximately 1:40 p.m., an unknown man approached a 25-year-old woman and wrestled her to the ground in the area of Edmonds Street and Canada Way. It’s believed the victim may have been followed for a short distance.    

Burnaby RCMP ask for public assistance in identifying a suspect that may have been involved in3 unprovoked assaults

Two children involved in Vancouver coyote attacks

Two children involved in Vancouver coyote attacks
Conservation officers are patrolling the park and the service says it's working with provincial wildlife biologists to determine how to manage the animals.

Two children involved in Vancouver coyote attacks

Can we reach herd immunity with COVID-19?

Can we reach herd immunity with COVID-19?
Herd immunity refers to having enough people within a community protected from a virus or pathogen, either through natural infection or vaccination, that transmission becomes unlikely.

Can we reach herd immunity with COVID-19?

Evacuation orders due to B.C. wildfires drop

Evacuation orders due to B.C. wildfires drop
The emergency operations centre for the central Okanagan says assessments of neighbourhoods directly affected by the 830-square-kilometre White Rock Lake fire along the western banks of Okanagan Lake should be complete by Thursday.

Evacuation orders due to B.C. wildfires drop

Surrey man, Shri Rampol, arrested for allegedly sexually assaulting a woman during a massage: Surrey RCMP

Surrey man, Shri Rampol, arrested for allegedly sexually assaulting a woman during a massage: Surrey RCMP
This investigation began in March 2021, when Surrey RCMP received a report alleging that a woman was sexually assaulted while receiving a massage at Shri Professional Massage, located at 1105-7360 137 Street.

Surrey man, Shri Rampol, arrested for allegedly sexually assaulting a woman during a massage: Surrey RCMP