Close X
Tuesday, November 19, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Shots fired at Surrey RCMP Officer

Shots fired at Surrey RCMP Officer
There is a road closure in effect on 82 Avenue between 128 Street and 124 Street. The roadway is expected to be closed for some time as the Integrated Forensic Identification Service collects evidence in the area.

Shots fired at Surrey RCMP Officer

820 COVID19 cases for Friday

820 COVID19 cases for Friday
There are 5,850 active cases of COVID-19 in the province and 165,027 people who tested positive have recovered. Of the active cases, 281 individuals are in hospital and 135 are in intensive care. The remaining people are recovering at home in self-isolation.    

820 COVID19 cases for Friday

Third COVID shot recommended for immunocompromised

Third COVID shot recommended for immunocompromised
Canada's chief public health officer Dr. Theresa Tam says the advice applies to people 12 and older whose immune systems are compromised for a variety of reasons like being treated for a tumour or having an untreated HIV infection that has advanced.

Third COVID shot recommended for immunocompromised

Surrey RCMP need the public's assistance in locating missing man Siasat Cheema

Surrey RCMP need the public's assistance in locating missing man Siasat Cheema
It is out of character for Siasat Cheema to be out of contact, and police and family are concerned for his well-being. Siasat Cheema is described as a 30 year old, South Asian man, 6 ft., 199 lbs., with black hair and a short beard. He was last seen wearing a white shirt and blue jeans.  

Surrey RCMP need the public's assistance in locating missing man Siasat Cheema

Debate: Leaders spar over climate, foreign policy

Debate: Leaders spar over climate, foreign policy
Right off the bat, the role of the moderator, Shachi Kurl, came under fire, with Blanchet taking umbrage at what he termed her suggestion that Quebec is racist.

Debate: Leaders spar over climate, foreign policy

Leaders back on the hustings after two debates

Leaders back on the hustings after two debates
NDP Leader Jagmeet Singh was early out of the gate on Friday morning, holding a news conference in Ottawa to tout his party’s platform before flying to British Columbia where he was scheduled to vote in advance polls on the first day they open.

Leaders back on the hustings after two debates