Close X
Monday, November 18, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

VPD investigates disturbing Downtown Eastside attack

VPD investigates disturbing Downtown Eastside attack
The victim, a 22-year-old Downtown Eastside resident, was standing in front of the Downtown Eastside Women’s Centre at Columbia Street and East Cordova when he felt a sharp pain in his leg and realized he’d been shot. With an arrow lodged just below his kneecap, the victim walked a block to Insite, where staff gave first aid and called 9-1-1.

VPD investigates disturbing Downtown Eastside attack

Federal deficit hit $48.5 billion in July

Federal deficit hit $48.5 billion in July
The Finance Department's regular fiscal monitor says the budgetary deficit between April and July was just under $48.5 billion, down from the almost $148.6 billion recorded over the same months in 2020 when COVID-19 first struck.

Federal deficit hit $48.5 billion in July

Vote count could spill into weekend

Vote count could spill into weekend
Officials started counting mail ballots on Friday morning in Nanaimo-Ladysmith, a three-way battle between the NDP, Tories and Greens, according to Elections Canada. Votes tallied on election night from polling stations suggest the NDP have a narrow lead in the B.C. riding.

Vote count could spill into weekend

Some health triage has begun in Alberta: doctor

Some health triage has begun in Alberta: doctor
Parks said that in recent days some critically ill COVID-19 patients who should have been on ventilators were not getting them. That's on top of previously announced mass cancellations of surgeries, along with patient transfers, as doctors balance medical need with available space, he said.

Some health triage has begun in Alberta: doctor

Police look at new MP for alleged flyer tampering

Police look at new MP for alleged flyer tampering
George Chahal, a former city councillor, won the only non-Conservative seat in Calgary, edging out Conservative Jag Sahota in the riding of Calgary Skyview.

Police look at new MP for alleged flyer tampering

Meng Wanzhou reaches deal with U.S. prosecutors

Meng Wanzhou reaches deal with U.S. prosecutors
Meng, who appeared in court via video link, answered most of Judge Ann Donnelly's questions with simple yes and no answers, all with the help of a court-appointed translator.

Meng Wanzhou reaches deal with U.S. prosecutors