Close X
Monday, November 18, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

714 COVID19 cases for Friday

714 COVID19 cases for Friday
There are 6,317 active cases of COVID-19 in the province, and 178,980 people who tested positive have recovered. Of the active cases, 328 individuals are in hospital and 138 are in intensive care. The remaining people are recovering at home in self-isolation.

714 COVID19 cases for Friday

Reports of shooting at Metrotown station: Burnaby RCMP

Reports of shooting at Metrotown station: Burnaby RCMP
Metrotown station has been closed down by Transit Police and Burnaby RCMP are on scene there are reports of a shooting along with unconfirmed reports of a pipe bomb. Burnaby RCMP has taken to Twitter to with various updates regarding the incident.

Reports of shooting at Metrotown station: Burnaby RCMP

New Westminster man convicted in court of child luring and child pornography

New Westminster man convicted in court of child luring and child pornography
This investigation spanned international borders and the New Westminster Police Department extends its appreciation to all police agencies who provided assistance, namely the British Columbia Integrated Child Exploitation Unit and the U.S. Department of Homeland Security.

New Westminster man convicted in court of child luring and child pornography

Trudeau faces backlash over Tofino trip

Trudeau faces backlash over Tofino trip
The Native Women’s Association of Canada (NWAC) said it is shocked that Trudeau “ducked out entirely” from a national day set aside to reflect on the legacy of residential schools.

Trudeau faces backlash over Tofino trip

Former Vancouver mayor Philip Owen dies at 88

Former Vancouver mayor Philip Owen dies at 88
A statement from his family says he died peacefully on Sept. 30 from complications related to Parkinson's disease. Owen served in various elected roles in Vancouver from 1978 to 2002, including the last nine years as the city's mayor.

Former Vancouver mayor Philip Owen dies at 88

Minister restores federal review of coal mine

Minister restores federal review of coal mine
Environment Minister Jonathan Wilkinson has reinstated his decision to subject a thermal coal mine expansion in Alberta to a federal review after a court ordered him to rethink it. Wilkinson said the Alberta First Nation whose objections led to the court order concerning the Vista mine project have now withdrawn their concerns. 

Minister restores federal review of coal mine