Close X
Sunday, November 17, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Premier's office fostered toxic workplace: lawsuit

Premier's office fostered toxic workplace: lawsuit
A former senior political staffer in the Alberta government alleges in a lawsuit that the premier’s office fostered a “poisoned work environment” and repeatedly failed to address her complaint of sexual harassment about another employee.

Premier's office fostered toxic workplace: lawsuit

North Korean refugees will be screened: Canada

North Korean refugees will be screened: Canada
The Immigration Department says it will also check that refugees fleeing Kim Jong Un's authoritarian regime do not have a criminal background. Under the new program, Canadian citizens will for the first time be able to privately sponsor North Koreans so they can settle in Canada.

North Korean refugees will be screened: Canada

609 COVID19 cases for Wednesday

609 COVID19 cases for Wednesday
There are currently 4,748 active cases of COVID-19 in the province, and 196,342 people who tested positive have recovered. Of the active cases, 422 individuals are currently in hospital and 157 are in intensive care. 

609 COVID19 cases for Wednesday

B.C. introduces new health service for kids, youth

B.C. introduces new health service for kids, youth
Mitzi Dean, B.C.'s minister of children and family development, says the province's current system is a patchwork of programs where many children and youth must wait for a diagnosis before receiving supports.    

B.C. introduces new health service for kids, youth

West Fraser earns US$460M as sales nearly double

West Fraser earns US$460M as sales nearly double
The Vancouver-based lumber, oriented strand board and paper manufacturer says it earned US$460 million or US$4.20 per diluted share for the three months ended Sept. 30.

West Fraser earns US$460M as sales nearly double

Police investigate hateful graffiti at Sikh Gurdwara

Police investigate hateful graffiti at Sikh Gurdwara
Sometime between 9 p.m., on Sunday, Oct. 24, 2021, and 7 a.m., the next morning, two hateful phrases were painted on roads outside the temple with arrows pointing towards the building. The Gurdwara is located at 739 81 St S.W., and the two painted phrases were found along 81 Street and Old Banff Coach Road S.W.

Police investigate hateful graffiti at Sikh Gurdwara