Close X
Sunday, November 17, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

COVID-19 cases rising for B.C. kids aged 5 to 11

COVID-19 cases rising for B.C. kids aged 5 to 11
The province says 550 cases were diagnosed this week in that age group from 14,295 total cases in the province between Oct. 26 and Nov. 1. Fifty-six of those children went to hospital, and four of them received critical care.

COVID-19 cases rising for B.C. kids aged 5 to 11

VPD investigates South Van home invasion that results in senior assaulted in broad daylight

VPD investigates South Van home invasion that results in senior assaulted in broad daylight
At 4:30 p.m. on October 29, VPD officers were called to a home near East 35th Avenue and Victoria Drive after an unknown man entered the home through the unlocked front door. The 89-year-old home owner was assaulted when he confronted the suspect. The suspect fled before officers arrived.

VPD investigates South Van home invasion that results in senior assaulted in broad daylight

Tories call for Afghan safe house funding

Tories call for Afghan safe house funding
The Conservative opposition is calling on Liberal government to give urgent funding to Kabul safe houses that are providing refuge to 1,700 Afghan interpreters and their families. On Friday, those safe houses are set to close because the money keeping them open will run out.    

Tories call for Afghan safe house funding

Canada joins pledge to end public financing of oil

Canada joins pledge to end public financing of oil
"Canada can lead in the low-carbon world if we keep putting our investments, innovations and brain power behind ambitious climate action," Environment Minister Steven Guilbeault said in a news release.

Canada joins pledge to end public financing of oil

Moose crashes into Saskatoon classroom

Moose crashes into Saskatoon classroom
Veronica Baker, a spokeswoman for Saskatoon Public Schools, says a before-school program was taking place in the room when the unexpected visitor made its dramatic entrance.

Moose crashes into Saskatoon classroom

Champagne's D.C. takeaway: more meetings

Champagne's D.C. takeaway: more meetings
Champagne says the two sides talked about how to strengthen cross-border supply chains, the potential role of Canada's critical-minerals industry and meeting shared climate goals.

Champagne's D.C. takeaway: more meetings