Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Climate pledges risk making Canada 'outlier': CAPP

Climate pledges risk making Canada 'outlier': CAPP
Tim McMillan says that as Canada increases its environmental ambition at events such as this week's climate conference in Scotland, the federal government must work harder to bring the rest of the world along.

Climate pledges risk making Canada 'outlier': CAPP

B.C. woman who killed teen back on day parole

B.C. woman who killed teen back on day parole
Kelly Ellard, now 39 years old and the mother of two children, has returned to day parole after the privilege was revoked in August for what a Parole Board of Canada decision says were indications of drug and alcohol use.

B.C. woman who killed teen back on day parole

Pfizer says COVID-19 pill cut hospital, death risk by 90%

Pfizer says COVID-19 pill cut hospital, death risk by 90%
Currently most COVID-19 treatments require an IV or injection. Competitor Merck’s COVID-19 pill is already under review at the Food and Drug Administration after showing strong initial results, and on Thursday the United Kingdom became the first country to OK it.

Pfizer says COVID-19 pill cut hospital, death risk by 90%

Economy created 31K jobs in October, StatCan says

Economy created 31K jobs in October, StatCan says
Statistics Canada says the unemployment rate would have been 8.7 per cent in October, down from 8.9 per cent in September, had it not included in calculations Canadians who wanted to work but didn't search for a job.

Economy created 31K jobs in October, StatCan says

COVID-19 cases declining across Canada

COVID-19 cases declining across Canada
Tam welcomed the high level of vaccine coverage across Canada, and said some regions are seeing very low COVID-19 activity. But she warned regional differences in vaccine coverage could still create surges in months to come, even if the upswings could be less dramatic and wide-spread.

COVID-19 cases declining across Canada

Tam says border testing needs to be re-examined

Tam says border testing needs to be re-examined
Currently, anyone crossing into Canada needs to show a recent, molecular test that shows a negative result for COVID-19 in order to get into Canada. At a cost of $150 to $300 per test, that can be a pricey proposition, particularly for families

Tam says border testing needs to be re-examined