Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Tories who questioned vaccines not in critic roles

Tories who questioned vaccines not in critic roles
O'Toole chose his shadow cabinet at a time when he's dealing with some members of his caucus expressing what he characterizes as unhelpful and confusing messages about getting vaccinated against COVID-19.

Tories who questioned vaccines not in critic roles

Metro Vancouver least ready for outage: BC Hydro

Metro Vancouver least ready for outage: BC Hydro
The report from the Crown utility says more than half of Lower Mainland residents think their region is the most prepared for storm-related power outages, but fewer than half have an outage plan or emergency kit at home.

Metro Vancouver least ready for outage: BC Hydro

VPD makes arrest after woman stabbed with hypodermic needle

VPD makes arrest after woman stabbed with hypodermic needle
“Investigators believe the woman may have been followed out of the coffee shop and confronted by the suspect, who then stabbed her with the dirty needle,” adds Sergeant Addison. “Because we don’t know what was in the needle and whether there will be any long-term health impacts, the victim was taken to hospital for treatment.”

VPD makes arrest after woman stabbed with hypodermic needle

Woman transported to hospital after incident in Surrey

Woman transported to hospital after incident in Surrey
Just before 1:30 a.m. on November 7, a cell guard noted the woman had fallen from her bunk onto the floor. Upon further assessment the woman was found to be unresponsive and not breathing. An officer and the cell nurse began life saving efforts, until these efforts were assumed by BC Emergency Health Services and the Surrey Fire Department.

Woman transported to hospital after incident in Surrey

1,438 COVID19 cases over 3 days

1,438 COVID19 cases over 3 days
There are 4,282 active cases of COVID-19 in the province, and 202,898 people who tested positive have recovered. Of the active cases, 407 individuals are in hospital and 121 are in intensive care. 

1,438 COVID19 cases over 3 days

VPD arrests 32 in weekend shoplifting clampdown

VPD arrests 32 in weekend shoplifting clampdown
Though shoplifting remains vastly under-reported, Vancouver Police have seen a surge in people using violence while stealing from stores. Cases involving weapons – things like knives, needles and bear spray – have shot up 550 per cent since 2019. Commercial robberies have gone up 126 per cent during that same time.

VPD arrests 32 in weekend shoplifting clampdown