Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Green cars, shipping on tap for Canada in Glasgow

Green cars, shipping on tap for Canada in Glasgow
Transport Minister Omar Alghabra also signed Canada on to a zero-emission car accord, an international aviation emissions promise and an agreement to make heavy trucks and buses emission-free in less tha

Green cars, shipping on tap for Canada in Glasgow

BC Housing Market at Historically Low Level of Supply

BC Housing Market at Historically Low Level of Supply
Total active residential listings were down nearly 40 per cent year-over-year in October, falling to an all-time record low for the province. Active listings have now fallen for five consecutive months on a seasonally adjusted basis.

BC Housing Market at Historically Low Level of Supply

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated
At Monday’s regular Council meeting, Surrey City Council adopted the same vaccination requirements that have been introduced for City staff. Effective January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated and provide proof of vaccination to the City.    

As of January 4, 2022, all City of Surrey staff and elected officials must be fully vaccinated

Seeking witnesses to pedestrian hit and run: Richmond RCMP

Seeking witnesses to pedestrian hit and run: Richmond RCMP
According to the pedestrian, as he crossed Bridgeport Rd at Simpson Rd a vehicle allegedly pulled out of a parking lot, striking him, which resulted in him falling to the ground. The pedestrian did not get a good look at the vehicle, however, a witness described the vehicle as a gray SUV.

Seeking witnesses to pedestrian hit and run: Richmond RCMP

Fatal collision in Langley claims the life of a 17 year old

Fatal collision in Langley claims the life of a 17 year old
The driver and lone occupant, a 17-year-old male from Langley, did not survive the collision. His family has been advised of his passing.    

Fatal collision in Langley claims the life of a 17 year old

Man guilty of first degree murder in 2019 homicide

Man guilty of first degree murder in 2019 homicide
Vancouver resident Zenen Cepeda Silva was found suffering from a gunshot injury and was transported to hospital, where he was pronounced dead.    

Man guilty of first degree murder in 2019 homicide