Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

555 COVID19 cases for Wednesday

555 COVID19 cases for Wednesday
There are currently 4,321 active cases of COVID-19 in the province, and 203,909 people who tested positive have recovered. Of the active cases, 404 individuals are currently in hospital and 117 are in intensive care. The remaining people are recovering at home in self-isolation.

555 COVID19 cases for Wednesday

Surrey-Fleetwood MLA Jagrup Brar acclaimed as new chair of BC NDP caucus

Surrey-Fleetwood MLA Jagrup Brar acclaimed as new chair of BC NDP caucus
Brar, who was first elected in 2004 and was re-elected in 2005, 2009, 2017 and 2020, will begin serving in this leadership role at the end of the fall legislative sitting.

Surrey-Fleetwood MLA Jagrup Brar acclaimed as new chair of BC NDP caucus

B.C. university launches wind buoy in power idea

B.C. university launches wind buoy in power idea
A highly customized buoy, equipped with a wind turbine and a 3D laser-scanning system, will soon be launched off the Victoria-area coast to transmit live data.

B.C. university launches wind buoy in power idea

Vancouver Police appeals for witnesses to hit-and-run

Vancouver Police appeals for witnesses to hit-and-run
The motorcycle rider, 29, was taken to hospital for serious, but non-life threatening injuries.  He has since been released from hospital and is recovering at home.

Vancouver Police appeals for witnesses to hit-and-run

Annamie Paul formally resigns, quits Green Party

Annamie Paul formally resigns, quits Green Party
Annamie Paul, the Green Party leader, has formally resigned and has also handed in her party membership. Paul says she has sent in a formal resignation letter to the Green Party, which follows her announcement in September of her plans to step down.

Annamie Paul formally resigns, quits Green Party

Freeland: Feds can help with jobs market mismatch

Freeland: Feds can help with jobs market mismatch
Although the country has recovered the three million jobs lost at the onset of the pandemic last year, the ranks of Canada's long-term unemployed remains well above pre-pandemic levels, and many people, particularly women, have dropped out of the labour force altogether.

Freeland: Feds can help with jobs market mismatch