Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Rocks and mudslides close B.C. highways

Rocks and mudslides close B.C. highways
Rising rivers or landslides also prompted evacuation orders in Merritt, Agassiz, Abbotsford and in Princeton, where a dike burst Monday morning, forcing residents of about 200 properties from their homes. In Merritt, rising river waters overwhelmed the city's water system and residents were ordered to "immediately cease" all water use.

Rocks and mudslides close B.C. highways

473 COVID19 cases for Friday

473 COVID19 cases for Friday
There are currently 4,265 active cases of COVID-19 in the province, and 204,963 people who tested positive have recovered. Of the active cases, 384 individuals are currently in hospital and 124 are in intensive care. The remaining people are recovering at home in self-isolation.

473 COVID19 cases for Friday

Police and SAR searching for Shannon White: Kamloops RCMP

Police and SAR searching for Shannon White: Kamloops RCMP
As part of the investigation, police received information confirming Ms. White’s vehicle left town for a 45-minute period on Nov. 1, shortly after Ms. White was supposed to have arrived at work.  Her vehicle was observed travelling west on the Trans Canada Highway, leading officers to the area being searched.  

Police and SAR searching for Shannon White: Kamloops RCMP

Canada could OK kids vaccine in '1 to 2 weeks'

Canada could OK kids vaccine in '1 to 2 weeks'
Canada's chief medical adviser Dr. Supriya Sharma said in a conference call with reporters Friday that the regulator is "actively continuing" its review of the Pfizer-BioNtech jab for children aged five to 11, which was authorized for use in the United States earlier this month.

Canada could OK kids vaccine in '1 to 2 weeks'

Ng disappointed, not daunted by US protectionism

Ng disappointed, not daunted by US protectionism
Mary Ng said that includes the revival of Buy American provisions in President Joe Biden's massive new infrastructure bill, which are creating more hurdles for foreign companies to bid on lucrative projects.

Ng disappointed, not daunted by US protectionism

B.C. Remembrance Day gatherings disrupted

B.C. Remembrance Day gatherings disrupted
A lawyer says he and his two young daughters left what he thought was a Remembrance Day ceremony In Kamloops after it turned out to be a protest against British Columbia's vaccine mandate. 

B.C. Remembrance Day gatherings disrupted