Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Tory senator pushes for O'Toole leadership review

Tory senator pushes for O'Toole leadership review
A Conservative senator has begun a petition pushing for a review of Erin O'Toole's leadership of the party within six months — the latest rumbling of discontent over losing the recent federal election.

Tory senator pushes for O'Toole leadership review

Premier faces call for early leadership review

Premier faces call for early leadership review
Representatives of 22 UCP constituencies have sent a letter to the party's executive saying they have met the required threshold required for a vote on Kenney’s performance at a special meeting before March 1.

Premier faces call for early leadership review

People trapped on highway to be rescued by air

People trapped on highway to be rescued by air
Twelve people had been rescued from Highway 7 near Agassiz by the local fire department on Sunday evening before the Vancouver Heavy Urban Search and Rescue Team was called in on Monday.

People trapped on highway to be rescued by air

Group calls for vote on Surrey, B.C., police force

Group calls for vote on Surrey, B.C., police force
Darlene Bennett launched the campaign with the group Surrey Police Vote over concerns about rising costs associated with starting a new municipal police force, which was a key pledge in Mayor Doug McCallum's election campaign in 2018.

Group calls for vote on Surrey, B.C., police force

B.C. plans no-protest zones around hospitals

B.C. plans no-protest zones around hospitals
The Ministry of the Attorney General says the legislation would establish 20-metre zones around hospitals, schools and COVID-19 vaccination and test centres, making it an offence to impede access to the facilities and their services.

B.C. plans no-protest zones around hospitals

1,270 COVID19 cases over 3 days

1,270 COVID19 cases over 3 days
There are 3,837 active cases of COVID-19 in the province, and 206,665 people who tested positive have recovered. Of the active cases, 376 individuals are in hospital and 116 are in intensive care. The remaining people are recovering at home in self-isolation.

1,270 COVID19 cases over 3 days