Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Joly, Freeland, Ng, Mendicino joining D.C. summit

Joly, Freeland, Ng, Mendicino joining D.C. summit
Mélanie Joly is in Mexico City for meetings with counterpart Marcelo Ebrard before travelling to Washington, D.C., for the so-called Three Amigos summit Thursday.

Joly, Freeland, Ng, Mendicino joining D.C. summit

Moderna seeks approval of kids' vaccine in Canada

Moderna seeks approval of kids' vaccine in Canada
Health Canada says it has received a submission from Moderna to authorize use of its COVID-19 vaccine for children aged 6 to 11. The agency says it will prioritize the review of the submission, while maintaining high scientific standards for safety, efficacy and quality.

Moderna seeks approval of kids' vaccine in Canada

CSIS help to RCMP 'very limited' in extremist case

CSIS help to RCMP 'very limited' in extremist case
The review agency looked at how CSIS and the Mounties worked together on investigating certain extremists based in Canada, though details of the specific threat were stripped from the report.

CSIS help to RCMP 'very limited' in extremist case

Crews search for cars trapped by B.C. mudslides

Crews search for cars trapped by B.C. mudslides
The mudslides rolled over the highway during an "atmospheric river" that brought a deluge of rain and flooding to the southwest and central parts of the province.

Crews search for cars trapped by B.C. mudslides

Alberta, Ottawa ink $10-a-day child-care deal

Alberta, Ottawa ink $10-a-day child-care deal
Alberta has signed on to Ottawa’s $10-a-day child-care program, but not before Premier Jason Kenney dismissed the federal contribution as recycled provincial money and accused Prime Minister Justin Trudeau of playing favourites.

Alberta, Ottawa ink $10-a-day child-care deal

Dozens rescued from B.C. highway mudslides

Dozens rescued from B.C. highway mudslides
Jashanpreet Singh and his wife, Harleen Kaur, were also caught between the two slides Sunday and came upon a vehicle that had been partially crushed by a slide. A nine-year-old boy had been injured and had blood coming out of his nose and ears, Kaur said. Firefighters who were first to the scene on Sunday were able to take the boy to care, she said. 

Dozens rescued from B.C. highway mudslides