Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

Veterans' case managers at 'breaking point': union

Veterans' case managers at 'breaking point': union
 The head of the union representing Veterans Affairs Canada case managers is warning her members are near their “breaking point” thanks to an excessive amount of work and lack of support from higher ups.

Veterans' case managers at 'breaking point': union

338 COVID19 cases for Tuesday

338 COVID19 cases for Tuesday
There are currently 3,568 active cases of COVID-19 in the province, and 207,275 people who tested positive have recovered. Of the active cases, 376 individuals are currently in hospital and 107 are in intensive care. The remaining people are recovering at home in self-isolation.

338 COVID19 cases for Tuesday

Feds promise news on COVID-19 border measures

Feds promise news on COVID-19 border measures
The government has faced mounting pressure for weeks to do away with a requirement for fully vaccinated travellers into Canada to provide a negative molecular COVID-19 test.

Feds promise news on COVID-19 border measures

Body found in B.C. highway landslide: RCMP

Body found in B.C. highway landslide: RCMP
RCMP say the body of a woman has been recovered from a landslide across Highway 99 near Lillooet, B.C., following historic rainfall as a search continues for others who may be buried in the debris.

Body found in B.C. highway landslide: RCMP

Surrey RCMP is asking the public's help in locating missing male Bhavneet Singh

Surrey RCMP is asking the public's help in locating missing male Bhavneet Singh
Bhavneet Singh was reported missing on November 11, 2021. He was last seen on November 09, 2021 at 7:00 a.m., in the 7300-block of 146A Street in Surrey. It is out of character for Singh to not contact family for this long. Police and family are concerned for his health and well-being.

Surrey RCMP is asking the public's help in locating missing male Bhavneet Singh

Blood Services to request end to gay donation ban

Blood Services to request end to gay donation ban
Canadian Blood Services is preparing to ask Health Canada to allow it to scrap questions about gender or sexuality, basing screening on higher-risk sexual behaviour such as anal sex instead. Potential donors could be asked if they have had multiple sexual partners, and about their sexual behaviour instead of their sexuality and gender.

Blood Services to request end to gay donation ban