Close X
Saturday, November 16, 2024
ADVT 
National

Government moves ahead on replacement for Massey Tunnel

Darpan News Desk BC Government, 09 Feb, 2022 04:10 PM
  • Government moves ahead on replacement for Massey Tunnel

Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

“We are moving ahead with a new toll-free tunnel to replace the George Massey Tunnel, and these contracts will support the ministry’s work as we move from development to construction,” said Rob Fleming, Minister of Transportation and Infrastructure. “The new tunnel, along with a new Steveston Interchange and Highway 99 improvements, are being designed to improve safety, reliability and connectivity while aligning with regional interests.”

The following contracts with a total value of $56.7 million were awarded following the Province of B.C.’s thorough procurement process:

Owner's Engineering Service (Immersed Tube Tunnel):
COWI North America Ltd.
Value: $15,000,000

Owner's Engineering Service (Highway and Civil Works):
R.F. Binnie and Associates Ltd.  
Value: $15,000,000

Archaeological Services:
Golder Associates
Value: $2,100,000

Environmental Services:
Golder Associates
Value: $14,771,000

Independent Environmental Monitor for the Corridor Improvement Projects:
Sartori Environmental Inc.     
Value: $725,000

Marine Navigation Advisor:
TyPlan Consulting
Value: $322,000

Communication and Engagement Services (Highway 99 Tunnel Project/Steveston Interchange Project):
Lucent Quay Consulting Inc.
Value: $4,187,690

Hydrotechnical and River Hydraulics Services:
Northwest Hydraulic Consultants Ltd.
Value $4,400,000

Marine Construction Advisor:
RAM Engineering Ltd.
Value: $202,000

The Highway 99 Tunnel Program will result in travel-time savings in the region for vehicles, including buses, as well as providing new opportunities for people who cycle or walk. 

The next step in the Fraser River Tunnel Project is to initiate the environmental assessment process. This includes ongoing engagement with Indigenous groups and stakeholders and preparation for procurement. The new tunnel is estimated to cost $4.15 billion and is scheduled to be complete in 2030.

In the interim, improvements to transit and cycling infrastructure along Highway 99 are underway. Construction of the new Steveston Interchange is scheduled to begin this year.

Transportation Investment Corporation is leading the delivery of the major elements (eight-lane tunnel and Steveston Interchange) of the Highway 99 Tunnel Program on behalf of the Ministry of Transportation and Infrastructure, and will provide the controls, practices and other oversights essential for this complex project.

MORE National ARTICLES

VPD investigations lead to charges in stranger assaults

VPD investigations lead to charges in stranger assaults
Kay is also accused of assault in connection with an incident that occurred October 21 at the Pan Pacific Hotel. In that case, a man was arrested after he allegedly threatened to stab a stranger with a needle.    

VPD investigations lead to charges in stranger assaults

Canada's grocers grapple with inflation, shortages

Canada's grocers grapple with inflation, shortages
Loblaw Companies Ltd. and Metro Inc. released their latest financial results on Wednesday, offering a glimpse at the inflationary pressures and labour challenges hitting the grocery industry.

Canada's grocers grapple with inflation, shortages

B.C. farmers finding ways to protect animals

B.C. farmers finding ways to protect animals
Abbotsford Mayor Henry Braun detailed some of the rescue efforts for farm animals happening in his Fraser Valley community during a news conference where he announced an evacuation order for 1,100 homes in the Sumas Prairie area.

B.C. farmers finding ways to protect animals

B.C. continues recovery from flooding, landslides

B.C. continues recovery from flooding, landslides
Public Safety Minister Mike Farnworth says supplies of food, cots and blankets are being delivered to the town of Hope, which is helping nearly 1,100 people. On Tuesday, RCMP recovered the body of a woman from a landslide across Highway 99 near Lillooet.

B.C. continues recovery from flooding, landslides

Statistics Canada says Annual inflation rate rises to 4.7% in October

Statistics Canada says Annual inflation rate rises to 4.7% in October
Statistics Canada said Wednesday that the annual pace of inflation in October rose to 4.7 per cent, the largest year-over-year gain since February 2003.

Statistics Canada says Annual inflation rate rises to 4.7% in October

National emergency alert test to be conducted

National emergency alert test to be conducted
Canadians should expect to see one test message from their provincial or territorial emergency management organization over television, radio, and compatible wireless devices at 12:55 p.m. EST.

National emergency alert test to be conducted