Close X
Wednesday, November 27, 2024
ADVT 
National

Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

Darpan News Desk Translink, 13 Jul, 2021 03:30 PM
  • Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

TransLink today announced that it will be proceeding with a major upgrade to Burrard SkyTrain Station beginning in early 2022. The project will take approximately two years to complete and will require the closure of the station to allow the work to be done safely and more efficiently than were it to remain partially open during construction.

Burrard SkyTrain Station was originally built in 1985 and has not had a significant upgrade in its 36 years of operation. It is the fourth busiest station on the SkyTrain system and at peak times it is congested with only three escalators and one elevator to move people in and out. Station entrances are hard to access and the station will require upgrades to the electrical equipment in order to meet the power demands of the new station.

The upgrades to Burrard Station will:

  • Double the number of escalators and elevators to provide greater accessibility and relieve congestion on platforms and at the concourse level;

  • Relocate the Burrard Street entrance to align with the pedestrian crossing making it easier to get in and out of the station, and provide better access to buses along Dunsmuir;

  • Redesign the station’s outdoor plaza to put pedestrian needs at the forefront; and,

  • Upgrade the station’s power supply and mechanical systems.

“These significant upgrades are necessary to keep our transit system operating effectively and efficiently for our customers,” said TransLink Interim CEO Gigi Chen-Kuo. “With more than 7.6 million annual boardings in 2019, Burrard Station is the fourth busiest station on our SkyTrain network. These upgrades will greatly improve the customer experience and as the region prepares to welcome one million new residents by the year 2050, this important project allows us to be prepared for additional future demand.”

To best manage construction during these important upgrades, we will be closing Burrard Station for approximately two years starting in early 2022. Closing the station during construction:

  • Improves customer and worker safety by eliminating the risks of customer movement through a major, underground, active construction site;

  • Minimizes confusion associated with multiple changes to customer travel patterns through numerous complex phases of construction;

  • Reduces overall construction time for the project and therefore shortens impacts to customer travel by approximately two and a half years; and

  • Provides cost savings of approximately $35 million.

TransLink will work with the City of Vancouver, and local businesses and residents to minimize impacts while we complete these upgrades.

Based on pre-Covid ridership data, Waterfront and Granville Stations can accommodate the additional passenger flow during the Burrard Station closure. Additional bus service will also be added in the area to help minimize passenger impact.

To minimize impacts on our bus and HandyDART customers, bus service will remain largely the same throughout the construction period and HandyDART customers connecting to the Expo Line will have access at Waterfront Station.

As plans are finalized later this year, we will provide more details to help ready our customers for the start of construction in early 2022.

MORE National ARTICLES

Burnaby RCMP looking for a maskless man who assaulted a worker

Burnaby RCMP looking for a maskless man who assaulted a worker
The suspect attacked the employee and continued punching him in the head and back when he fell to the ground. When another employee interrupted the assault, the suspect threatened to kill the employee with a knife.

Burnaby RCMP looking for a maskless man who assaulted a worker

Overnight closure of George Massey Tunnel on May 28, 29

Overnight closure of George Massey Tunnel on May 28, 29
On both nights Friday and Saturday, the George Massey Tunnel will be closed in both directions from 10 p.m. to 4 a.m. The closure is necessary to safely allow testing of the tunnel’s fire suppression system and overhead lane control signals.

Overnight closure of George Massey Tunnel on May 28, 29

Too early to predict looser travel rules: Alghabra

Too early to predict looser travel rules: Alghabra
Speaking at a virtual news conference Thursday, Alghabra said decisions around hotel quarantines for air passengers and the eventual reopening of the border will hinge on expert advice and unspecified criteria tied to the pandemic.

Too early to predict looser travel rules: Alghabra

Mortgage tests tighten amid central bank warning

Mortgage tests tighten amid central bank warning
In its latest financial system review, the Bank of Canada said many households have taken on large mortgages compared with their income, limiting their flexibility to deal with an unforeseen financial shock like the loss of a job.    

Mortgage tests tighten amid central bank warning

No outside oversight of proactive info: officials

No outside oversight of proactive info: officials
Justin Trudeau promised in the 2015 election campaign to allow Canadians to request documents from ministerial offices through the Access to Information Act, but he backed away from the pledge after the Liberals assumed power.    

No outside oversight of proactive info: officials

B.C. resident faces hate speech charge over videos

B.C. resident faces hate speech charge over videos
A probe by the RCMP's international investigations section into videos that allegedly threatened people in the Democratic Republic of Congo has resulted in charges against a man living in Kelowna, B.C.

B.C. resident faces hate speech charge over videos