Close X
Sunday, November 24, 2024
ADVT 
National

Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

Darpan News Desk Translink, 13 Jul, 2021 03:30 PM
  • Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

TransLink today announced that it will be proceeding with a major upgrade to Burrard SkyTrain Station beginning in early 2022. The project will take approximately two years to complete and will require the closure of the station to allow the work to be done safely and more efficiently than were it to remain partially open during construction.

Burrard SkyTrain Station was originally built in 1985 and has not had a significant upgrade in its 36 years of operation. It is the fourth busiest station on the SkyTrain system and at peak times it is congested with only three escalators and one elevator to move people in and out. Station entrances are hard to access and the station will require upgrades to the electrical equipment in order to meet the power demands of the new station.

The upgrades to Burrard Station will:

  • Double the number of escalators and elevators to provide greater accessibility and relieve congestion on platforms and at the concourse level;

  • Relocate the Burrard Street entrance to align with the pedestrian crossing making it easier to get in and out of the station, and provide better access to buses along Dunsmuir;

  • Redesign the station’s outdoor plaza to put pedestrian needs at the forefront; and,

  • Upgrade the station’s power supply and mechanical systems.

“These significant upgrades are necessary to keep our transit system operating effectively and efficiently for our customers,” said TransLink Interim CEO Gigi Chen-Kuo. “With more than 7.6 million annual boardings in 2019, Burrard Station is the fourth busiest station on our SkyTrain network. These upgrades will greatly improve the customer experience and as the region prepares to welcome one million new residents by the year 2050, this important project allows us to be prepared for additional future demand.”

To best manage construction during these important upgrades, we will be closing Burrard Station for approximately two years starting in early 2022. Closing the station during construction:

  • Improves customer and worker safety by eliminating the risks of customer movement through a major, underground, active construction site;

  • Minimizes confusion associated with multiple changes to customer travel patterns through numerous complex phases of construction;

  • Reduces overall construction time for the project and therefore shortens impacts to customer travel by approximately two and a half years; and

  • Provides cost savings of approximately $35 million.

TransLink will work with the City of Vancouver, and local businesses and residents to minimize impacts while we complete these upgrades.

Based on pre-Covid ridership data, Waterfront and Granville Stations can accommodate the additional passenger flow during the Burrard Station closure. Additional bus service will also be added in the area to help minimize passenger impact.

To minimize impacts on our bus and HandyDART customers, bus service will remain largely the same throughout the construction period and HandyDART customers connecting to the Expo Line will have access at Waterfront Station.

As plans are finalized later this year, we will provide more details to help ready our customers for the start of construction in early 2022.

MORE National ARTICLES

Liberals set 2035 goal for electric vehicle sales

Liberals set 2035 goal for electric vehicle sales
The Liberal government is speeding up its goal for when it wants to see all light-duty vehicles sold in Canada to be electric. Transport Minister Omar Alghabra announced Tuesday that by 2035 all new cars and light-duty trucks sold in the country will be zero-emission vehicles. 

Liberals set 2035 goal for electric vehicle sales

Burnaby RCMP respond to 25 sudden death calls in just 24 hours due to heatwave

Burnaby RCMP respond to 25 sudden death calls in just 24 hours due to heatwave
Temperatures in the Vancouver area reached just under 32 C Monday, but the humidity made it feel close to 40 C in areas that aren't near water, Environment Canada said.

Burnaby RCMP respond to 25 sudden death calls in just 24 hours due to heatwave

COVID-19 deaths may be twice that reported: Study

COVID-19 deaths may be twice that reported: Study
A new study suggests Canada has vastly underestimated how many people have died from COVID-19 and says the number could be two times higher than reported.

COVID-19 deaths may be twice that reported: Study

Heat records tumble as heat wave grips the West

Heat records tumble as heat wave grips the West
A record-breaking heat wave could ease over parts of British Columbia, Yukon and Northwest Territories by Wednesday but any reprieve for the Prairie provinces is further off.

Heat records tumble as heat wave grips the West

PBO: gun buyback could cost up to $756M

PBO: gun buyback could cost up to $756M
The high-end buyback figure is the budget officer's estimate for how much it would cost for the government to buy back every gun that the industry estimates is owned across Canada.

PBO: gun buyback could cost up to $756M

New drug-pricing regulations delayed a third time

New drug-pricing regulations delayed a third time
Health Minister Patty Hajdu is delaying the first big overhaul of Canada's patented-medicines pricing system for a third time. The regulations changing how the Patented Medicine Pricing Review Board ensures price fairness on new drugs now won't take effect until next January, so that pharmaceutical companies have more time to prepare.

New drug-pricing regulations delayed a third time