Close X
Monday, September 23, 2024
ADVT 
National

Brakes failed in fatal train derailment

Darpan News Desk The Canadian Press, 31 Mar, 2022 09:53 AM
  • Brakes failed in fatal train derailment

CALGARY - An investigation into a fatal train derailment near the British Columbia-Alberta boundary has found the locomotive's brakes failed with prolonged exposure to cold temperatures.

The Transportation Safety Board of Canada on Thursday released its findings into the February 2019 derailment that killed three Canadian Pacific Railway employees.

The train was parked on a grade near Field, B.C., when it started rolling on its own and gained speeds far above the limit for the mountain pass. It derailed at a curve in the tracks and 99 grain cars and two locomotives plummeted off a bridge.

The safety board said its findings show an inbound train engineer had warned the trainmaster of brake system irregularities, but they were not seen as problematic.

It said the trainmaster's training and experience did not adequately prepare him to evaluate the circumstances or to make decisions.

It also found brake cylinders on the freight cars were leaking compressed air and, worsened by their age and condition and extreme cold, reached a critical threshold before the brakes gave out.

The board said it has made multiple recommendations to Transport Canada to enhance the safety of train operations in cold weather, including a requirement to install automatic parking brakes on freight cars.

"The leakage of compressed air from the train's air-brake system degraded the performance of the brakes in the extreme cold temperature," reads the report.

"As a result, even though the inbound locomotive engineer had increased the amount of braking several times while going down Field Hill towards Partridge, the train's speed continued to increase. When the speed reached 21 (miles per hour), the train crew applied the brakes in emergency."

The derailment prompted a criminal investigation by the RCMP that Staff Sgt. Janelle Shoihet has said continues with no timeline for completion.

Conductor Dylan Paradis, engineer Andrew Dockrell and trainee Daniel Waldenberger-Bulmer died in the derailment.

The families of two of the men filed a lawsuit last April alleging negligence against Canadian Pacific, its CEO, board of directors, CP police and the federal minister of transport.

MORE National ARTICLES

1,187 COVID19 cases for Wednesday

1,187 COVID19 cases for Wednesday
There are 21,974 active cases of COVID-19 in the province, and 310,533 people who tested positive have recovered. Of the active cases, 893 COVID-positive individuals are in hospital and 143 are in intensive care. The remaining people are recovering at home in self-isolation

1,187 COVID19 cases for Wednesday

Vancouver's beached barge to be disassembled: city

Vancouver's beached barge to be disassembled: city
A barge that had been the subject of jokes and the star of many photos after becoming stuck on a popular Vancouver beach during a severe storm in November is on its way out. The City of Vancouver says a process is underway to remove the grounded barge from English Bay by taking it apart in pieces.    

Vancouver's beached barge to be disassembled: city

B.C. provides $8.3 million to Lytton recovery

B.C. provides $8.3 million to Lytton recovery
Municipal Affairs Minister Josie Osborne says all of village's records and backup servers were lost in last summer's wildfire and the content of many of its bylaws are unknown. The government also announced $8.3 million in funding to support ongoing operations and recovery for the village.

B.C. provides $8.3 million to Lytton recovery

Arson at Guildford apartment building

Arson at Guildford apartment building
Upon attendance, Surrey Fire Service quickly extinguished a fire located in the hallway of the building. Thankfully no injuries were reported, however it appears these fires were intentionally lit.   

Arson at Guildford apartment building

Government moves ahead on replacement for Massey Tunnel

Government moves ahead on replacement for Massey Tunnel
Nine contracts have been awarded for technical and engineering expertise to support the Province’s delivery of the Highway 99 Tunnel Program to replace the Massey Tunnel, which will improve mobility along the corridor between Richmond and Delta.

Government moves ahead on replacement for Massey Tunnel

Governor General tests positive for COVID-19

Governor General tests positive for COVID-19
Gov. Gen. Mary Simon says in a statement on Twitter that she tested positive Wednesday morning and is experiencing mild symptoms. Simon says she will continue to self-isolate and take some time to rest in the coming days.

Governor General tests positive for COVID-19