Close X
Friday, October 4, 2024
ADVT 
National

BC Hydro begins filling reservoir as Site C dam megaproject nears completion

Darpan News Desk The Canadian Press, 26 Aug, 2024 03:42 PM
  • BC Hydro begins filling reservoir as Site C dam megaproject nears completion

BC Hydro says it has begun filling the reservoir created by the massive Site C dam project in northeastern British Columbia.

The provincial electric utility says in a statement that the filling of the reservoir is one of the last steps toward starting operations for the controversial dam project, located about 14 kilometres southwest of Fort St. John, B.C.

BC Hydro says it will take between two and four months to fill the 83-kilometre-long reservoir, which will cover about 5,550 hectares of land while totalling about 9,330 hectares in surface area.

The utility is warning people to stay away from the area of the reservoir for at least a year after it has been filled, citing possible unstable terrain and floating debris as potential hazards.

Construction of Site C was launched in 2015 under then-premier Christy Clark's BC Liberals government and has seen cost estimates spike from up to $6.6 billion in 2007 to $16 billion in 2021.

Multiple groups opposed the province's plan to complete the dam after the NDP formed government in B.C. in 2017, but former premier John Horgan said the dam needed to be finished despite his party not supporting the start of construction in the first place. 

Horgan said at the time that cancelling the megaproject mid-construction would have meant laying off 4,500 workers as well as the loss of $10 billion in costs already sunk in building the dam, resulting in a 26 per cent increase in B.C. residents' hydro bills over 10 years.

The project had been opposed by groups such as the Peace Valley Landowner Association, Prophet River First Nation and West Moberly First Nations on both environmental and land-rights grounds.

BC Hydro says construction is now more than 85-per-cent complete, with the first power-generating unit on-site scheduled to begin operations in December.

When all six power generators are operational by fall 2025, BC Hydro says Site C will add 1,100 megawatts of electricity capacity while producing about 5,100 gigawatt hours annually — about an eight-per-cent increase to the province's overall power supply.

BC Hydro says Site C will provide enough clean electricity to reliably power nearly 500,000 homes or 1.7 million electric vehicles when fully operational.

The provincial utility says the project also remains on track to be completed within the $16-billion budget established in 2021.

The idea of Site C — a third dam on the Peace River in northeastern B.C. — began decades ago but had been shelved in 1989 due to local opposition.

MORE National ARTICLES

B.C. warns of summer drought, asks people to conserve water

B.C. warns of summer drought, asks people to conserve water
A statement from the Forests Ministry says recent rains have provided some relief in parts of B.C., but it hasn't been enough to make up the deficit. B.C.'s drought map shows much of the northeastern corner of the province is at drought level four on the five-level scale, meaning conditions are extremely dry with communities and ecosystems likely to experience adverse impacts.

B.C. warns of summer drought, asks people to conserve water

Reign of world's largest hockey stick coming to an end as Duncan holds survey

Reign of world's largest hockey stick coming to an end as Duncan holds survey
The 28,118-kilogram stick was built to mark the entrance to the Canada pavilion at Vancouver's Expo in 1986, but 37 years later the Cowichan Valley Regional District said it is coming to "the end of its life."  

Reign of world's largest hockey stick coming to an end as Duncan holds survey

B.C. public schools move away from letter grades from kindergarten to Grade 9

B.C. public schools move away from letter grades from kindergarten to Grade 9
A statement from the Education Ministry says that starting in the 2023-2024 school year, only students in grades 10, 11 and 12 will receive letter grades and percentages so post-secondary entry requirements are met. 

B.C. public schools move away from letter grades from kindergarten to Grade 9

Body found in vacant lot: VPD

Body found in vacant lot: VPD
Police say a body has been found in a vacant lot in East Vancouver. Constable Tania Visintin says the discovery was made last night by a passerby. It's Vancouver's ninth homicide of 2023.

Body found in vacant lot: VPD

Sikh Liberal MPs meet with public safety minister over Surrey killing

Sikh Liberal MPs meet with public safety minister over Surrey killing
The federal Liberal Party's Sikh caucus -- which includes several members of Parliament from B-C -- has met with Public Safety Minister Marco Mendocino to discuss the killing of Surrey Sikh leader Hardeep Singh Nijjar. Seven caucus members met with the minister last night.

Sikh Liberal MPs meet with public safety minister over Surrey killing

Man in hospital after being hit by a bus

Man in hospital after being hit by a bus
A man is in hospital with critical injuries after being hit by a bus in Surrey on Friday morning. At 2:40am, Surrey RCMP responded to a report of a pedestrian motor vehicle crash in the 14000 block of 96th avenue.  

Man in hospital after being hit by a bus