Close X
Saturday, November 30, 2024
ADVT 
National

Archeological Survey Says No Indigenous Artifacts At Montreal Office Tower Sitec

Darpan News Desk The Canadian Press, 23 Mar, 2015 11:16 AM

    MONTREAL — Construction has resumed at the site of a Montreal office tower after an archeological survey put to rest any concerns there were indigenous artifacts in the ground below.

    Ivanhoe Cambridge stopped excavation work in mid-February after citizen concerns the site might contain artifacts linked to the Dawson archeological site, remnants of an ancient Iroquois village discovered in 1859.

    The real-estate arm of Quebec's pension fund manager, the Caisse de depot et placement, said in a statement Monday a survey has given it the all-clear to continue building the 27-storey Maison Manuvie office tower.

    Ivanhoe commissioned the study despite having proper permits that said the project was outside any designated archeological zones.

    The Dawson excavation site is considered a potential site of the Iroquois village of Hochelaga as described by Jacques Cartier during his second trip in 1535. The village near Mount Royal was located in present-day Montreal, although its exact location remains unknown.

    The Dawson site has historical resonance for many, said Andre Costopoulos, a McGill University anthropology professor.

    "It (the Dawson site) was clearly an important residential site, a large village site that was probably occupied for a long period of time," Costopoulos said. "The finds that were made there are still quite important in understanding what happened in the St-Lawrence Valley in late pre-history."

    The chances of finding Hochelaga are fairly remote.

    "The more development on the island, the fewer candidate sites remain undisturbed," Costopoulos said.

    The survey, conducted by the firm Archeotec, said the soils were stripped during road and infrastructure construction in the 19th and 20th, leaving little to unearth.

    "In particular, the surface soils that could conceal archaeological elements connected to site are clearly not there," the firm said. 

    Robert Galbraith, a freelance photographer who sounded the alarm, said he's not surprised by the results, but believes better care should be taken given the increase in construction.

    "If we took for granted every time we built in a sensitive area of heritage concern, we would never have anything left," Galbraith said.

    The office tower will house Manulife (TSX: MFC) employees following that company's $4-billion acquisition of Standard Life Canada last September.

    MORE National ARTICLES

    Four Arrested After Five People Shot In Toronto: Police

    Four Arrested After Five People Shot In Toronto: Police
    TORONTO — Four people have been arrested in a shooting in northwest Toronto that sent five people to hospital, one with life-threatening injuries, police said Thursday.

    Four Arrested After Five People Shot In Toronto: Police

    Complainant Testifies At Trial Of Suspended Senator Patrick Brazeau

    Complainant Testifies At Trial Of Suspended Senator Patrick Brazeau
    GATINEAU, Que. — The complainant in the trial of suspended senator Patrick Brazeau has started testifying on the opening day of the case.

    Complainant Testifies At Trial Of Suspended Senator Patrick Brazeau

    Cod Stocks Off Newfoundland Improving But Recovery Still Years Away: Researchers

    Cod Stocks Off Newfoundland Improving But Recovery Still Years Away: Researchers
    ST. JOHN'S, N.L. — Scientists tracking northern cod stocks off Newfoundland say there are hopeful signs of recovery but that any lifting of an almost 23-year-old commercial fishing moratorium is likely a decade away.

    Cod Stocks Off Newfoundland Improving But Recovery Still Years Away: Researchers

    BC's Auditor For Local Government Fired Amid Controversy

    BC's Auditor For Local Government Fired Amid Controversy
    Minister of Community, Sport and Cultural Development Coralee Oakes announced that she is recommending auditor Basia Ruta's (BAH'-sia ROO'-tahz) appointment be rescinded.

    BC's Auditor For Local Government Fired Amid Controversy

    Mission, B.C., Residents In Shock After Flash Flood Surges Through 10 Homes

    Mission, B.C., Residents In Shock After Flash Flood Surges Through 10 Homes
    The massive flood was triggered by heavy rainfall over the weekend that overflowed a culvert already clogged with debris.

    Mission, B.C., Residents In Shock After Flash Flood Surges Through 10 Homes

    Whistler RCMP Investigating Death Of 18-Year-Old On Blackcomb Mountain

    Whistler RCMP Investigating Death Of 18-Year-Old On Blackcomb Mountain
    WHISTLER, B.C. — Whistler RCMP are investigating the death of an 18-year-old skier on Blackcomb Mountain.

    Whistler RCMP Investigating Death Of 18-Year-Old On Blackcomb Mountain

    PrevNext